{"title":"Impact of the ULTC on the dynamic voltage collapse of an electric power system with large scale of wind generation","authors":"R. Pereira, C. Ferreira, F. Barbosa","doi":"10.1109/UPEC.2012.6398431","DOIUrl":null,"url":null,"abstract":"Voltage stability is predominantly a load stability phenomenon and solutions to voltage stability can be found by control of the load as seen from the bulk power network. A delay of the load restoration gives time for other corrective actions. The load restoration may be delayed and/or limited by certain countermeasures, such as blocking of Under Load Tap Changers (ULTC). In this paper it was studied the impact of the ULTC on the dynamic voltage collapse of an electric power system with large scale wind generation. It is used the Cigré Electric Power Network with 32 bus and three wind farms equipped with wind turbines, including pitch control coupled with a Fixed Speed Induction Generator (FSIG) and a shunt capacitor bank. The automatic voltage regulators (AVR) of the generating units and the turbine speed governors were modelled. Different load models were used and the ULTC were taken into account. Several significant disturbances were simulated in the test power network, such as the increase of the wind speed, the tripping of an overhead transmission line and three-phase short-circuits. The simulation results were obtained using the EUROSTAG software package. Finally, some conclusions that provide a better understanding of the ULTC effect on the dynamic voltage stability in a system with a large amount of wind power generation are pointed out.","PeriodicalId":326950,"journal":{"name":"2012 47th International Universities Power Engineering Conference (UPEC)","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-12-31","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 47th International Universities Power Engineering Conference (UPEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/UPEC.2012.6398431","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Voltage stability is predominantly a load stability phenomenon and solutions to voltage stability can be found by control of the load as seen from the bulk power network. A delay of the load restoration gives time for other corrective actions. The load restoration may be delayed and/or limited by certain countermeasures, such as blocking of Under Load Tap Changers (ULTC). In this paper it was studied the impact of the ULTC on the dynamic voltage collapse of an electric power system with large scale wind generation. It is used the Cigré Electric Power Network with 32 bus and three wind farms equipped with wind turbines, including pitch control coupled with a Fixed Speed Induction Generator (FSIG) and a shunt capacitor bank. The automatic voltage regulators (AVR) of the generating units and the turbine speed governors were modelled. Different load models were used and the ULTC were taken into account. Several significant disturbances were simulated in the test power network, such as the increase of the wind speed, the tripping of an overhead transmission line and three-phase short-circuits. The simulation results were obtained using the EUROSTAG software package. Finally, some conclusions that provide a better understanding of the ULTC effect on the dynamic voltage stability in a system with a large amount of wind power generation are pointed out.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
ULTC对大型风力发电电力系统动态电压崩溃的影响
电压稳定主要是一种负荷稳定现象,从大电网来看,电压稳定可以通过控制负荷来解决。负载恢复的延迟为其他纠正措施提供了时间。负载恢复可能会被某些对策延迟和/或限制,例如负载下分接开关(ULTC)的阻塞。本文研究了超低电压控制对大型风力发电电力系统动态电压崩溃的影响。它使用的是cigr电力网络,有32个总线和三个配备风力涡轮机的风力发电场,包括螺距控制与固定速度感应发电机(FSIG)和并联电容器组。对发电机组自动调压器和水轮机调速器进行了建模。采用了不同的负荷模型,并考虑了超负荷控制。在试验电网中模拟了风速增大、架空输电跳闸和三相短路等显著干扰。仿真结果采用EUROSTAG软件包进行计算。最后,给出了一些结论,有助于更好地理解超电压控制对大量风力发电系统动态电压稳定性的影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Performance evaluation of smart metering infrastructure using simulation tool Active power control from large offshore wind farms Performance study of distributed state estimation algorithms on the HiPerDNO HPC platform Current-sensoreless Boost converter for Maximum Power Tracking of thermoelectric generators Adaptive NeuroFuzzy Legendre based damping control paradigm for SSSC
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1