Process of cement production in Nepal

P. R. Pandey, N. Banskota
{"title":"Process of cement production in Nepal","authors":"P. R. Pandey, N. Banskota","doi":"10.3126/BDG.V11I0.1545","DOIUrl":null,"url":null,"abstract":"This paper describes general process of cement production from exploration of limestone deposit to production of clinker and finally cement. Exploration of limestone comprises area selection, target definition, reserve calculation, resource evaluation and reserve definition. After exploration, mining is taken up. Quarried limestone is stockpiled and then is blended with other raw material like clay/shale, silica, iron ore in required proportion. The blended material is then heated at high temperature upto 1400–1450 oC in a kiln to produce clinker. The clinker is grinned along with 3–5% gypsum to produce cement.","PeriodicalId":356325,"journal":{"name":"Bulletin of The Department of Geology","volume":"22 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-12-05","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bulletin of The Department of Geology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3126/BDG.V11I0.1545","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

This paper describes general process of cement production from exploration of limestone deposit to production of clinker and finally cement. Exploration of limestone comprises area selection, target definition, reserve calculation, resource evaluation and reserve definition. After exploration, mining is taken up. Quarried limestone is stockpiled and then is blended with other raw material like clay/shale, silica, iron ore in required proportion. The blended material is then heated at high temperature upto 1400–1450 oC in a kiln to produce clinker. The clinker is grinned along with 3–5% gypsum to produce cement.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
尼泊尔水泥生产过程
本文介绍了水泥生产的一般过程,从石灰石矿床的勘探到熟料的生产,最后到水泥的生产。石灰石勘探包括区域选择、目标确定、储量计算、资源评价和储量确定。勘探之后,就开始采矿。开采的石灰石被储存起来,然后与其他原料如粘土/页岩、二氧化硅、铁矿石按规定的比例混合。混合后的材料在高温下加热至1400-1450℃,在窑中产生熟料。熟料与3-5%的石膏一起磨成水泥。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Tectonic Stress Analysis of Shivnath-Salena Area, Using Stress Response Structure A Comparison of Statistical Validity of In-Situ Hydraulic Conductivity Prediction Models of Rock Mass Inferred from Borehole Logs and Lugeon Test Data Water Management in Hariwan Municipality of Nepal: Groundwater Harvesting from Riverbeds and Aquifers Study on Rock Characteristics for Assessing the Hydraulic Erodibility of Sandstones in the Manahari River Section, Sub-Himalaya, Central Nepal Recent Trends in the Study of Springs in Nepal: A Review
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1