Distributed generation as a solution for demand waiver heating loads

M. Hennes, B. J. Schmidt
{"title":"Distributed generation as a solution for demand waiver heating loads","authors":"M. Hennes, B. J. Schmidt","doi":"10.1109/REPCON.2004.1307053","DOIUrl":null,"url":null,"abstract":"Minnkota Power Cooperative (MPC) is a generation and transmission utility providing electric power to 11 distribution cooperatives and 12 municipal power agencies in eastern North Dakota and northwestern Minnesota. Cass County Electric Cooperative (CCEC) is a distribution cooperative member of MPC. In the mid 80's, MPC created a program whereby its member cooperatives could market electric heating energy without a demand charge in order to utilize excess energy production. As energy supplies have tightened up, this program was discontinued. The distribution cooperatives had to find a means to offset the electrical demand created by the heating loads which were added under this program and not included in the MPC load management program. In a joint effort, MPC and CCEC have worked to install ten diesel powered generation modules at the distribution level totaling 18.25 MW of peak electrical capacity. These units will he operated synchronously with the grid system during periods of peak electrical demand to offset the non-managed load created by the demand waiver heating program. This paper will detail some of the electrical and mechanical design and installation challenges and solutions for this project. Of special consideration for the project are the cold-weather climate conditions, design aspects for the interconnection, joint monitoring and control requirements, and operational guidelines incorporated into the completed project.","PeriodicalId":401769,"journal":{"name":"Rural Electric Power Conference, 2004","volume":"43 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2004-05-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Rural Electric Power Conference, 2004","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/REPCON.2004.1307053","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Minnkota Power Cooperative (MPC) is a generation and transmission utility providing electric power to 11 distribution cooperatives and 12 municipal power agencies in eastern North Dakota and northwestern Minnesota. Cass County Electric Cooperative (CCEC) is a distribution cooperative member of MPC. In the mid 80's, MPC created a program whereby its member cooperatives could market electric heating energy without a demand charge in order to utilize excess energy production. As energy supplies have tightened up, this program was discontinued. The distribution cooperatives had to find a means to offset the electrical demand created by the heating loads which were added under this program and not included in the MPC load management program. In a joint effort, MPC and CCEC have worked to install ten diesel powered generation modules at the distribution level totaling 18.25 MW of peak electrical capacity. These units will he operated synchronously with the grid system during periods of peak electrical demand to offset the non-managed load created by the demand waiver heating program. This paper will detail some of the electrical and mechanical design and installation challenges and solutions for this project. Of special consideration for the project are the cold-weather climate conditions, design aspects for the interconnection, joint monitoring and control requirements, and operational guidelines incorporated into the completed project.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
分布式发电作为免需供热负荷的解决方案
明科塔电力合作社(MPC)是一家发电和输电公用事业公司,为北达科他州东部和明尼苏达州西北部的11个配电合作社和12个市政电力机构提供电力。卡斯县电力合作社(CCEC)是MPC的配电合作社成员。在80年代中期,MPC创建了一个项目,使其成员合作社可以在没有需求费用的情况下销售电加热能源,以利用多余的能源生产。由于能源供应紧张,这个项目被中止了。配电合作社必须找到一种方法来抵消在该计划下增加的加热负荷所产生的电力需求,这些负荷不包括在MPC负荷管理计划中。在MPC和CCEC的共同努力下,他们已经在配电层面安装了10个柴油发电模块,总峰值电力容量为18.25兆瓦。这些机组将在电力需求高峰期间与电网系统同步运行,以抵消需求豁免供热计划产生的非管理负荷。本文将详细介绍该项目的一些电气和机械设计和安装挑战以及解决方案。该项目需要特别考虑的是寒冷的气候条件、互联的设计方面、联合监测和控制要求以及已完成项目的操作指南。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Distribution system grounding fundamentals Getting the most from your reliability budget Advancements in underground cable material and design specifications of the largest rural electric co-ops Seed based oil as an alternative to mineral oil IEEE Reliability Indices Standards - Major Event Day calculations and how it effects small utilities
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1