L. M. Joshi, R. Meena, S. Nangru, D. Kant, D. Pal, O. S. Lamba, V. Jindal, S. Jangid, D. Chakravarthy, K. Dixit
{"title":"Design and development of a 6 MW peak, 24 kW average power S-band Klystron","authors":"L. M. Joshi, R. Meena, S. Nangru, D. Kant, D. Pal, O. S. Lamba, V. Jindal, S. Jangid, D. Chakravarthy, K. Dixit","doi":"10.1109/IVEC.2011.5746857","DOIUrl":null,"url":null,"abstract":"A 6 MW peak, 24 kW average power Sband Klystron is under development at CEERI, Pilani under an MoU between BARC and CEERI. The design of the klystron has been completed. The electron gun has been designed using TRAK and MAGIC codes. RF cavities have been designed using HFSS and CST Microwave Studio while the complete beam wave interaction simulation has been done using MAGIC code. The thermal design of collector and RF window has been done using ANSYS code. A Gun Collector Test Module (GCTM) was developed before making actual klystron to validate gun perveance and thermal design of collector. A high voltage solid state pulsed modulator has been installed for performance evaluation of the tube. The paper will cover the design aspects of the tube and experimental test results of GCTM and klystron.","PeriodicalId":106174,"journal":{"name":"2011 IEEE International Vacuum Electronics Conference (IVEC)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2011-02-21","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2011 IEEE International Vacuum Electronics Conference (IVEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IVEC.2011.5746857","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
A 6 MW peak, 24 kW average power Sband Klystron is under development at CEERI, Pilani under an MoU between BARC and CEERI. The design of the klystron has been completed. The electron gun has been designed using TRAK and MAGIC codes. RF cavities have been designed using HFSS and CST Microwave Studio while the complete beam wave interaction simulation has been done using MAGIC code. The thermal design of collector and RF window has been done using ANSYS code. A Gun Collector Test Module (GCTM) was developed before making actual klystron to validate gun perveance and thermal design of collector. A high voltage solid state pulsed modulator has been installed for performance evaluation of the tube. The paper will cover the design aspects of the tube and experimental test results of GCTM and klystron.