The hole story: How a sinkhole in a phosphogypsum pile was explored and remediated

N. Fuleihan, J. E. Cameron, J. F. Henry
{"title":"The hole story: How a sinkhole in a phosphogypsum pile was explored and remediated","authors":"N. Fuleihan, J. E. Cameron, J. F. Henry","doi":"10.1201/9781003078128-47","DOIUrl":null,"url":null,"abstract":"On June 27, 1994, an erosion sinkhole occurred in the original 200-foot high phosphogypsum stack at the New Wales Plant ofIMC-Agrico Company. As a result, a plan of action was expediently developed to assess groundwater impacts and ensure that any contamination is contained on property, recovered, and appropriately handled at the plant. Shortly thereafter, resources were mobilized to define the extent of the erosion cavity in the natural confining unit beneath the stack, and to formulate and undertake appropriate repairs.","PeriodicalId":231730,"journal":{"name":"The Engineering Geology and Hydrology of Karst Terrains","volume":"24 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-12-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"The Engineering Geology and Hydrology of Karst Terrains","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1201/9781003078128-47","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

On June 27, 1994, an erosion sinkhole occurred in the original 200-foot high phosphogypsum stack at the New Wales Plant ofIMC-Agrico Company. As a result, a plan of action was expediently developed to assess groundwater impacts and ensure that any contamination is contained on property, recovered, and appropriately handled at the plant. Shortly thereafter, resources were mobilized to define the extent of the erosion cavity in the natural confining unit beneath the stack, and to formulate and undertake appropriate repairs.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
洞的故事:一个磷石膏堆的天坑是如何被探测和修复的
1994年6月27日,imc - agrico公司新南威尔士工厂原有的200英尺高的磷石膏堆发生了侵蚀性天坑。因此,迅速制定了一项行动计划,以评估对地下水的影响,并确保任何污染都在工厂内得到控制、回收和适当处理。此后不久,我们调动了资源来确定储层下方天然围封单元的侵蚀腔的范围,并制定和实施适当的修复措施。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Source identification investigations of petroleum contaminated groundwater in the Missouri Ozarks Groundwater tracing in the epikarst Rationale and methodology for approximating spring-basin boundaries in the mantled karst terrane of the Springfield Plateau, northwestern Arkansas Gypsum karst geohazards in China An example of the use of jet grouting to permit tunneling in chemically weathered limestone
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1