Stress distribution ahead of mechanized longwall top coal caving face with great cutting height

Tung Manh Bui, H. Nguyen, T. Nguyen
{"title":"Stress distribution ahead of mechanized longwall top coal caving face with great cutting height","authors":"Tung Manh Bui, H. Nguyen, T. Nguyen","doi":"10.46326/jmes.2021.62(5a).02","DOIUrl":null,"url":null,"abstract":"Longwall Top Coal Caving (LTCC) technology with great cutting height is a new development trend in mining thick coal seam. The cutting height of LTCC face typically ranges from 2.8 m to 3.2 m in many coal mining countvies, but it recently reaches up to 4.2 m in many coal mines in China. Because the cutting height increases, the caving height accordingly decreases that changes the stress distribution around coal face and law of roof rock caving. Based on the geological condition of Longwall 4108 at Ping Shou coal mine, ShanXi province, China, this paper presents a modelling of LTCC mining process with a cutting height of 4.2 m by using the numerical program FLAC3D. From the modelling, the paper presents an analysis of stress distribution ahead of LTCC face with great cutting height. The results show that as the coal face advances, the stress magnitude ahead of coal face increases. The peak front abutment stress moves further away from coal face. The stress concentration ratio increases, and stress concentration zone expands correspondingly. These changes of stress facilitate the failure of top coal, increasing the efficiency of top coal recovery and improving longwall face stability.","PeriodicalId":170167,"journal":{"name":"Journal of Mining and Earth Sciences","volume":"6 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Mining and Earth Sciences","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.46326/jmes.2021.62(5a).02","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Longwall Top Coal Caving (LTCC) technology with great cutting height is a new development trend in mining thick coal seam. The cutting height of LTCC face typically ranges from 2.8 m to 3.2 m in many coal mining countvies, but it recently reaches up to 4.2 m in many coal mines in China. Because the cutting height increases, the caving height accordingly decreases that changes the stress distribution around coal face and law of roof rock caving. Based on the geological condition of Longwall 4108 at Ping Shou coal mine, ShanXi province, China, this paper presents a modelling of LTCC mining process with a cutting height of 4.2 m by using the numerical program FLAC3D. From the modelling, the paper presents an analysis of stress distribution ahead of LTCC face with great cutting height. The results show that as the coal face advances, the stress magnitude ahead of coal face increases. The peak front abutment stress moves further away from coal face. The stress concentration ratio increases, and stress concentration zone expands correspondingly. These changes of stress facilitate the failure of top coal, increasing the efficiency of top coal recovery and improving longwall face stability.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
大切高综放工作面前方应力分布
大截高长壁顶放煤技术是厚煤层开采的新发展趋势。在许多煤矿县,LTCC工作面切割高度一般在2.8 ~ 3.2 m之间,但最近在中国许多煤矿,LTCC工作面切割高度达到了4.2 m。随着采煤高度的增加,落放高度相应降低,从而改变了工作面周围的应力分布和顶板落放规律。根据山西平寿煤矿4108长壁的地质条件,利用FLAC3D数值模拟程序,对切割高度为4.2 m的LTCC开采过程进行了数值模拟。从模型出发,分析了大切削高度下LTCC工作面前方的应力分布。结果表明:随着工作面推进,工作面前方应力强度增大;峰值前支承应力向工作面偏移较大。应力集中比增大,应力集中区相应扩大。这些应力变化有利于顶煤破坏,提高顶煤回采效率,改善长壁工作面稳定性。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
ESP Application for Oil Production in Naturally Fractured Granitic Basement Reservoir Comparison analytical hierarchy process (AHP) and frequency ratio (FR) method in assessment of landslide susceptibility. A case study in Van Yen district, Yen Bai province Deep geological structure of An Chau trough base on new study data Assessment of liquefaction potential of sand distributed in the 1 District, Ho Chi Minh city Geotechnical zoning in Hai Duong province for construction planning
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1