{"title":"Work","authors":"T. Bastia","doi":"10.4324/9781315555850-5","DOIUrl":null,"url":null,"abstract":"➢ Supervision of the replacement and commissioning of 48Vdc chargers (ELTEK-SFEE) on 8 sites. Production loss reduction to 1 hour. ➢ Involved in the replacement of former protection relays (CEE) by SEPAM. Protection settings optimization. ➢ PCB transformers replacement up to 5MVA (AREVA, France Transfo, OCREV...). ➢ Control and excitation cabinet replacement for 9MW turbo-generators with gas turbine. Supervision of all the electrical performance tests as well as GPC (DEIF) optimization settings. ➢ Reliability improvement for all homopolar protection devices. ➢ Realization and set up of new preventive plans with excel sheets for motors, transformers, chargers and battery with automatic plots of critical parameters versus time.","PeriodicalId":346674,"journal":{"name":"Gender, Migration and Social Transformation","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gender, Migration and Social Transformation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4324/9781315555850-5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

➢ Supervision of the replacement and commissioning of 48Vdc chargers (ELTEK-SFEE) on 8 sites. Production loss reduction to 1 hour. ➢ Involved in the replacement of former protection relays (CEE) by SEPAM. Protection settings optimization. ➢ PCB transformers replacement up to 5MVA (AREVA, France Transfo, OCREV...). ➢ Control and excitation cabinet replacement for 9MW turbo-generators with gas turbine. Supervision of all the electrical performance tests as well as GPC (DEIF) optimization settings. ➢ Reliability improvement for all homopolar protection devices. ➢ Realization and set up of new preventive plans with excel sheets for motors, transformers, chargers and battery with automatic plots of critical parameters versus time.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
工作
(四)监管8个站点48Vdc充电器(ELTEK-SFEE)更换及调试。生产损失降低到1小时。五、参与SEPAM对原保护继电器(CEE)的更换。保护设置优化。◆更换PCB变压器最高可达5MVA (AREVA, France Transfo, OCREV…)(四)9MW燃气轮机汽轮发电机组控制、励磁柜更换。监督所有电气性能测试以及GPC (DEIF)优化设置。四、提高所有同极保护装置的可靠性。(五)电机、变压器、充电器、电池等新的预防计划的实现和建立,并提供关键参数随时间的自动绘图。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Gender, migration, and social transformation Conclusion Mobility and social networks Intimacy Origins
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1