{"title":"Work","authors":"T. Bastia","doi":"10.4324/9781315555850-5","DOIUrl":null,"url":null,"abstract":"➢ Supervision of the replacement and commissioning of 48Vdc chargers (ELTEK-SFEE) on 8 sites. Production loss reduction to 1 hour. ➢ Involved in the replacement of former protection relays (CEE) by SEPAM. Protection settings optimization. ➢ PCB transformers replacement up to 5MVA (AREVA, France Transfo, OCREV...). ➢ Control and excitation cabinet replacement for 9MW turbo-generators with gas turbine. Supervision of all the electrical performance tests as well as GPC (DEIF) optimization settings. ➢ Reliability improvement for all homopolar protection devices. ➢ Realization and set up of new preventive plans with excel sheets for motors, transformers, chargers and battery with automatic plots of critical parameters versus time.","PeriodicalId":346674,"journal":{"name":"Gender, Migration and Social Transformation","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-05-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Gender, Migration and Social Transformation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4324/9781315555850-5","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
➢ Supervision of the replacement and commissioning of 48Vdc chargers (ELTEK-SFEE) on 8 sites. Production loss reduction to 1 hour. ➢ Involved in the replacement of former protection relays (CEE) by SEPAM. Protection settings optimization. ➢ PCB transformers replacement up to 5MVA (AREVA, France Transfo, OCREV...). ➢ Control and excitation cabinet replacement for 9MW turbo-generators with gas turbine. Supervision of all the electrical performance tests as well as GPC (DEIF) optimization settings. ➢ Reliability improvement for all homopolar protection devices. ➢ Realization and set up of new preventive plans with excel sheets for motors, transformers, chargers and battery with automatic plots of critical parameters versus time.