{"title":"Pump Scheduling Optimization Using Asynchronous Parallel","authors":"C. V. Lücken, B. Barán, Aldo Sotelo","doi":"10.19153/cleiej.7.2.2","DOIUrl":null,"url":null,"abstract":"\n \n \nOptimizing the pump-scheduling is an interesting proposal to achieve cost reductions in water distribution pumping stations. As systems grow, pump-scheduling becomes a very difficult task. In order to attack harder pump-scheduling problems, this work proposes the use of parallel asynchronous evolutionary algorithms as a tool to aid in solving an optimal pump-scheduling problem. In particular, this work considers a pump-scheduling problem having four objectives to be minimized: electric energy cost, maintenance cost, maximum power peak, and level variation in a reservoir. Parallel and sequential versions of different evolutionary algorithms for multi- objective optimization were implemented and their results compared using a set of experimental metrics. Analysis of metric results shows that our parallel asynchronous implementation of evolutionary algorithms is effective in searching for solutions among a wide range of alternative optimal pump schedules to choose from. \n \n \n","PeriodicalId":418941,"journal":{"name":"CLEI Electron. J.","volume":"26 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-08-16","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"27","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"CLEI Electron. J.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.19153/cleiej.7.2.2","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 27
Abstract
Optimizing the pump-scheduling is an interesting proposal to achieve cost reductions in water distribution pumping stations. As systems grow, pump-scheduling becomes a very difficult task. In order to attack harder pump-scheduling problems, this work proposes the use of parallel asynchronous evolutionary algorithms as a tool to aid in solving an optimal pump-scheduling problem. In particular, this work considers a pump-scheduling problem having four objectives to be minimized: electric energy cost, maintenance cost, maximum power peak, and level variation in a reservoir. Parallel and sequential versions of different evolutionary algorithms for multi- objective optimization were implemented and their results compared using a set of experimental metrics. Analysis of metric results shows that our parallel asynchronous implementation of evolutionary algorithms is effective in searching for solutions among a wide range of alternative optimal pump schedules to choose from.