Decision making of logistics project basing on unascertained theory and fuzzy method

Xiao Mei-dan
{"title":"Decision making of logistics project basing on unascertained theory and fuzzy method","authors":"Xiao Mei-dan","doi":"10.1109/ICICISYS.2009.5357961","DOIUrl":null,"url":null,"abstract":"Study on logistics project risk will give helpful information for managers to make decision or manage risk. Therefore, it is meaningful to evaluate the logistics project risk. This paper gives evaluation indexes system of logistics risk firstly, Then combines the unascertained theory with fuzzy method, and gives the evaluation model of logistic project risk basing on unascertained theory and fuzzy method, firstly the risk probability and risk loss are given by using the unascertained theory and fuzzy method respectively, then the whole risk of logistics project is given according to the mean of risk. And the application of the comprehensive evaluation model is given, which combines the quantitative analysis with qualitative analysis and the model is effective and system to evaluate risk, and is useful for managers to manage risk of logistic project.","PeriodicalId":206575,"journal":{"name":"2009 IEEE International Conference on Intelligent Computing and Intelligent Systems","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2009-12-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 IEEE International Conference on Intelligent Computing and Intelligent Systems","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICICISYS.2009.5357961","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Study on logistics project risk will give helpful information for managers to make decision or manage risk. Therefore, it is meaningful to evaluate the logistics project risk. This paper gives evaluation indexes system of logistics risk firstly, Then combines the unascertained theory with fuzzy method, and gives the evaluation model of logistic project risk basing on unascertained theory and fuzzy method, firstly the risk probability and risk loss are given by using the unascertained theory and fuzzy method respectively, then the whole risk of logistics project is given according to the mean of risk. And the application of the comprehensive evaluation model is given, which combines the quantitative analysis with qualitative analysis and the model is effective and system to evaluate risk, and is useful for managers to manage risk of logistic project.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于未确知理论和模糊方法的物流项目决策
对物流项目风险的研究将为管理者进行决策或风险管理提供有益的信息。因此,对物流项目风险进行评估具有重要意义。本文首先给出了物流风险的评价指标体系,然后将未确知理论与模糊方法相结合,给出了基于未确知理论和模糊方法的物流项目风险评价模型,首先利用未确知理论和模糊方法分别给出了物流项目的风险概率和风险损失,然后根据风险均值给出了物流项目的整体风险。并给出了综合评价模型的应用,该模型将定量分析与定性分析相结合,能够有效、系统地评价物流项目的风险,为管理者管理物流项目的风险提供了参考。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Genetic algorithm for the one-commodity pickup-and-delivery vehicle routing problem An intelligent model selection scheme based on particle swarm optimization A novel blind watermark algorithm based On SVD and DCT Optimization of machining parameters using estimation of distribution algorithms Optimal control analysis on a class of hybrid systems with impulses and switches
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1