Kajian Teknis Alat Muat dan Alat Angkut untuk Meningkatkan Produksi pada Penambangan Andesit PT Arto Bangun Cemerlang di Kecamatan Tanjungsari, Kabupaten Bogor, Provinsi Jawa Barat
{"title":"Kajian Teknis Alat Muat dan Alat Angkut untuk Meningkatkan Produksi pada Penambangan Andesit PT Arto Bangun Cemerlang di Kecamatan Tanjungsari, Kabupaten Bogor, Provinsi Jawa Barat","authors":"Shania Wulanda Sari, Zaenal, Sriyanti","doi":"10.29313/bcsme.v3i1.6604","DOIUrl":null,"url":null,"abstract":"Abstract. PT Arto Bangun Cemerlang is a private mining company engaged in mining andesite minerals located in Garogol Village, Sirnarasa Village, Tanjungsari District, Bogor Regency, West Java Province. The total area is ± 50 Ha with a production target of 25,000 tons/month or 9,803.92 BCM/month, the production target has not been achieved. The products produced by this company consist of 3 products, namely split stone, stone ash and screening, where the marketing of these products is allocated to various areas in Jabodetabek, such as Serpong, Citeureup, Kasabalangka Karawaci, Karawang and Pulau Gadung. In mining activities there are several factors that influence the unachieved production of loading and hauling equipment. This is caused by the high tool cycle time, delay time and improper loading pattern. In this study, it discusses efforts to increase production in loading and conveyance equipment. The loading equipment for the Sany SY215 Excavator and the transport equipment use the Isuzu Giga Tronton Type FV 285 Dump Truck. The effort made is to reduce the cycle time of the loading equipment by changing the bottom loading pattern to top loading. Barrier time is the time for the loading and unloading equipment to not produce, the drag time for the conveyance and unloading equipment can be seen based on the work efficiency of the loading and unloading equipment. The work efficiency of the loading equipment is 62.31% and the work efficiency of the transportation equipment is 89.34%. Based on the results of work efficiency of loading and transport equipment, loading equipment has more waiting time compared to transportation equipment because of the high stand by time on transportation equipment compared to loading equipment. Based on actual production data on the Sany SY215 Excavator loading equipment of 9,475.2 BCM/month and the transportation equipment with 3 units of Isuzu Giga Tronton Type FV 285 Dump Trucks, namely 9,455.04 BCM/month. As for some improvements made such as the pattern of loading and reducing the cycle time (circulation time) of loading and hauling equipment. After the repairs were carried out, there was an increase in production of loading and conveyance equipment, where the production of loading and unloading equipment after repairs was 11,037.6 BCM/month and 11,022.48 BCM/month for conveyances. \nAbstrak. PT Arto Bangun Cemerlang merupakan perusahaan tambang swasta yang bergerak pada bidang pertambangan bahan galian andesit yang berlokasi di Kampung Garogol, Desa Sirnarasa, Kecamatan Tanjungsari, Kabupaten Bogor Provinsi Jawa Barat. Luas wilayah keseluruhan ± 50 Ha dengan target produksi 25.000 Ton/bulan atau 9.803,92 BCM/bulan, target produksi tersebut belum tercapai. Produk yang dihasilkan perusahaan ini terdiri dari 3 produk yaitu batu split, abu batu dan screening, dimana pemasaran dari produk tersebut dialokasikan ke berbagai daerah di Jabodetabek, seperti Serpong, Citeureup, Kasabalangka Karawaci, Karawang dan Pulau Gadung. Pada kegiatan penambangan adanya beberapa faktor yang berpengaruh terhadap ketidaktercapaian produksi alat muat dan angkut. Hal ini disebabkan oleh cycle time alat yang tinggi, waktu hambatan dan pola pemuatan yang kurang tepat. Pada penelitian ini membahas mengenai upaya untuk meningkatkan produksi pada alat muat dan alat angkut. Alat muat menggunakan Excavator Sany SY215 dan alat angkut menggunakan Dump Truck Isuzu Giga Tronton Tipe FV 285. Upaya yang dilakukan yaitu dengan menurunkan cycle time (waktu edar) pada alat muat dengan mengubah pola pemuatan bottom loading menjadi top loading dan penembahan jumlah penumpahan bucket pada alat angkut. Waktu hambatan merupakan waktu alat muat dan alat angkut tidak produksi, waktu hambatan pada alat angkut dan alat muat dapat dilihat berdasarkan efisiensi kerja alat muat dan alat angkut. Efisiensi kerja alat muat sebesar 62,31 % dan efisiensi kerja alat angkut sebesar 89,34%. Berdasarkan hasil efisiensi kerja alat muat dan alat angkut, alat muat lebih banyak waktu menunggu dibandingkan dengan alat angkut karena tingginya waktu stand by time pada alat muat dibandingkan dengan alat angkut. Berdasarkan data aktual produksi pada alat muat Excavator Sany SY215 sebesar 9.475,2 BCM/bulan dan alat angkut dengan 3 unit Dump Truck Isuzu Giga Tronton Tipe FV 285 yaitu sebesar 9.455,04 BCM/bulan. Adapun beberapa perbaikan yang dilakukan seperti pada pola pemuatan dan menurunkan cycle time (waktu edar) alat muat dan angkut. Setelah dilakukan perbaikan, terdapat peningkatan produksi pada alat muat dan alat angkut, dimana produksi alat muat setelah adanya perbaikan sebesar 11.037,6 BCM/bulan dan alat angkut 11.022,48 BCM/bulan.","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-01-29","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bandung Conference Series: Mining Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/bcsme.v3i1.6604","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
Abstract. PT Arto Bangun Cemerlang is a private mining company engaged in mining andesite minerals located in Garogol Village, Sirnarasa Village, Tanjungsari District, Bogor Regency, West Java Province. The total area is ± 50 Ha with a production target of 25,000 tons/month or 9,803.92 BCM/month, the production target has not been achieved. The products produced by this company consist of 3 products, namely split stone, stone ash and screening, where the marketing of these products is allocated to various areas in Jabodetabek, such as Serpong, Citeureup, Kasabalangka Karawaci, Karawang and Pulau Gadung. In mining activities there are several factors that influence the unachieved production of loading and hauling equipment. This is caused by the high tool cycle time, delay time and improper loading pattern. In this study, it discusses efforts to increase production in loading and conveyance equipment. The loading equipment for the Sany SY215 Excavator and the transport equipment use the Isuzu Giga Tronton Type FV 285 Dump Truck. The effort made is to reduce the cycle time of the loading equipment by changing the bottom loading pattern to top loading. Barrier time is the time for the loading and unloading equipment to not produce, the drag time for the conveyance and unloading equipment can be seen based on the work efficiency of the loading and unloading equipment. The work efficiency of the loading equipment is 62.31% and the work efficiency of the transportation equipment is 89.34%. Based on the results of work efficiency of loading and transport equipment, loading equipment has more waiting time compared to transportation equipment because of the high stand by time on transportation equipment compared to loading equipment. Based on actual production data on the Sany SY215 Excavator loading equipment of 9,475.2 BCM/month and the transportation equipment with 3 units of Isuzu Giga Tronton Type FV 285 Dump Trucks, namely 9,455.04 BCM/month. As for some improvements made such as the pattern of loading and reducing the cycle time (circulation time) of loading and hauling equipment. After the repairs were carried out, there was an increase in production of loading and conveyance equipment, where the production of loading and unloading equipment after repairs was 11,037.6 BCM/month and 11,022.48 BCM/month for conveyances.
Abstrak. PT Arto Bangun Cemerlang merupakan perusahaan tambang swasta yang bergerak pada bidang pertambangan bahan galian andesit yang berlokasi di Kampung Garogol, Desa Sirnarasa, Kecamatan Tanjungsari, Kabupaten Bogor Provinsi Jawa Barat. Luas wilayah keseluruhan ± 50 Ha dengan target produksi 25.000 Ton/bulan atau 9.803,92 BCM/bulan, target produksi tersebut belum tercapai. Produk yang dihasilkan perusahaan ini terdiri dari 3 produk yaitu batu split, abu batu dan screening, dimana pemasaran dari produk tersebut dialokasikan ke berbagai daerah di Jabodetabek, seperti Serpong, Citeureup, Kasabalangka Karawaci, Karawang dan Pulau Gadung. Pada kegiatan penambangan adanya beberapa faktor yang berpengaruh terhadap ketidaktercapaian produksi alat muat dan angkut. Hal ini disebabkan oleh cycle time alat yang tinggi, waktu hambatan dan pola pemuatan yang kurang tepat. Pada penelitian ini membahas mengenai upaya untuk meningkatkan produksi pada alat muat dan alat angkut. Alat muat menggunakan Excavator Sany SY215 dan alat angkut menggunakan Dump Truck Isuzu Giga Tronton Tipe FV 285. Upaya yang dilakukan yaitu dengan menurunkan cycle time (waktu edar) pada alat muat dengan mengubah pola pemuatan bottom loading menjadi top loading dan penembahan jumlah penumpahan bucket pada alat angkut. Waktu hambatan merupakan waktu alat muat dan alat angkut tidak produksi, waktu hambatan pada alat angkut dan alat muat dapat dilihat berdasarkan efisiensi kerja alat muat dan alat angkut. Efisiensi kerja alat muat sebesar 62,31 % dan efisiensi kerja alat angkut sebesar 89,34%. Berdasarkan hasil efisiensi kerja alat muat dan alat angkut, alat muat lebih banyak waktu menunggu dibandingkan dengan alat angkut karena tingginya waktu stand by time pada alat muat dibandingkan dengan alat angkut. Berdasarkan data aktual produksi pada alat muat Excavator Sany SY215 sebesar 9.475,2 BCM/bulan dan alat angkut dengan 3 unit Dump Truck Isuzu Giga Tronton Tipe FV 285 yaitu sebesar 9.455,04 BCM/bulan. Adapun beberapa perbaikan yang dilakukan seperti pada pola pemuatan dan menurunkan cycle time (waktu edar) alat muat dan angkut. Setelah dilakukan perbaikan, terdapat peningkatan produksi pada alat muat dan alat angkut, dimana produksi alat muat setelah adanya perbaikan sebesar 11.037,6 BCM/bulan dan alat angkut 11.022,48 BCM/bulan.
摘要。PT Arto Bangun Cemerlang是一家私营矿业公司,从事开采位于西爪哇省茂物县Tanjungsari区Sirnarasa村Garogol村的安山岩矿物。总面积为±50公顷,生产目标为2.5万吨/月或9803.92亿立方米/月,未完成生产目标。该公司生产的产品由三种产品组成,即分裂石,石灰和筛分,这些产品的销售分布在Jabodetabek的各个地区,如Serpong, Citeureup, Kasabalangka Karawaci, Karawang和Pulau Gadung。在采矿活动中,有几个因素影响装载和运输设备的未实现生产。这是由刀具周期时间长,延迟时间和不正确的加载方式造成的。本文就如何提高装载和输送设备的产量进行了探讨。装载设备为三一SY215挖掘机,运输设备为五十铃千兆特龙型FV 285自卸车。所做的努力是通过将底部装载模式改为顶部装载来减少装载设备的循环时间。障碍时间是装卸设备不产生的时间,根据装卸设备的工作效率可以看出输送和装卸设备的阻力时间。装货设备的工作效率为62.31%,运输设备的工作效率为89.34%。从装载和运输设备的工作效率结果来看,由于运输设备的待机时间比装载设备高,因此装载设备的等待时间比运输设备要长。根据实际生产数据,三一SY215挖掘机装载设备为9475.2 BCM/月,运输设备为3台五十铃千兆通型FV 285自卸车,即9455.04 BCM/月。对装车方式和缩短装车、拖运设备的循环时间等方面进行了改进。维修后装卸设备产量有所增加,维修后装卸设备产量11037.6 BCM/月,运输设备产量11022.48 BCM/月。Abstrak。PT Arto Bangun Cemerlang merupakan perusahaan tambang swastan pertambangan bahan galian andesit yang berlokasi di Kampung Garogol, Desa Sirnarasa, Kecamatan Tanjungsari, Kabupaten茂物省爪哇巴拉特。Luas wilayah keseluuhan±50 Ha dunan目标产量为25.000吨/bulan,平均产量为9.803吨/bulan,目标产量为92吨/bulan。Produk yang dihasilkan perusahaan ini terdiri dari 3 product yitu batu split, abu batu dan screening, dimana pemasaran dari product tersebut dialokasikan ke berbagai daerah di Jabodetabek, serperti Serpong, Citeureup, Kasabalangka Karawaci, Karawang dan Pulau Gadung。Pada kegiatan penambangan adanya beberapapfakto yang berpenagaru,这句话的意思是:Pada kegiatan penambangan adanya beberapapfaku。halini disebabkan oleh周期时间警报杨廷吉,waktu hambatan和pola pemuatan yang kurang tepat。padpadpenelitian ini成员的mengenai upaya untuk meningkatkan产品是padpadalatmuat和alatangkut。Alat muat menggunakan挖掘机三一SY215和Alat angkut menggunakan自卸卡车五十铃Giga Tronton型号fv285。Upaya yang dilakukan yitu dengan menurunkan循环时间(waktu edar) pada alat muat dengan mengubah pola pemuatan底部装载menjadi顶部装载dan penembahan jumlah penumpahan桶pada alat angkut。Waktu hambatan merupakan Waktu alat muat dan angkut tidak produksi, Waktu hambatan pada alat angkut danalat patat dilihat berdasarkan efisiensi kerja alat muat dan alat angkut。为62,31 %,为89,34%。Berdasarkan hasil efisiensi kerja alat muat dan alat angkut, alat muat lebih banyak waktu menungu dibandingkan dengan alat angkut karena tingginya waktu stand by time pada alat muat dibandingkan dengan alat angkut。Berdasarkan数据实际产品为:挖掘机三一SY215 sebesar 9.475,2 BCM/bulan; 3台自卸卡车五十铃千兆吨级FV 285 yitu sebesar 9.455,04 BCM/bulan。Adapun beberapa perbaikan yang dilakukan seperti pada pola pemuatan dan menurunkan周期时间(waktu edar) alat muat dan angkut。Setelah dilakukan perbaikan, terdapat peningkatan produksi pada alat muat dan alat angkut, dimana produksi alat muat Setelah adanya perbaikan sebesar 11.037,6 BCM/bulan和alat angkut 11.022,48 BCM/bulan。