Public-Private Partnerships with No Contractual Base Case:

A. Martins
{"title":"Public-Private Partnerships with No Contractual Base Case:","authors":"A. Martins","doi":"10.21552/epppl/2023/1/7","DOIUrl":null,"url":null,"abstract":"The purpose of this article is to discuss a method for compensating a private concession-aire for cash flow losses related to Covid-19 suffered in 2020 and 2021. The analysis is based on a public-private partnership (PPP) set up to exploit surface parking lots, signed between a Portuguese municipality and a private corporation. The contract has no financial base case. The article concludes that a base case is not an obstacle to calculate this type of compensation, that the previous performance of the contractor is a reasonable basis to estimate losses and the forecasts extending to 2026 are a good schema with which to estimate the extension of the concession period claimed by the Petitioner. The arbitration court deciding the corporation's claim has valid reasons for an equitable decision. © 2023, Lexxion Verlagsgesellschaft mbH. All rights reserved.","PeriodicalId":176734,"journal":{"name":"European Procurement & Public Private Partnership Law Review","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"European Procurement & Public Private Partnership Law Review","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.21552/epppl/2023/1/7","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The purpose of this article is to discuss a method for compensating a private concession-aire for cash flow losses related to Covid-19 suffered in 2020 and 2021. The analysis is based on a public-private partnership (PPP) set up to exploit surface parking lots, signed between a Portuguese municipality and a private corporation. The contract has no financial base case. The article concludes that a base case is not an obstacle to calculate this type of compensation, that the previous performance of the contractor is a reasonable basis to estimate losses and the forecasts extending to 2026 are a good schema with which to estimate the extension of the concession period claimed by the Petitioner. The arbitration court deciding the corporation's claim has valid reasons for an equitable decision. © 2023, Lexxion Verlagsgesellschaft mbH. All rights reserved.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
没有合同基础案例的公私伙伴关系:
本文的目的是讨论补偿私营特许公司在2020年和2021年因Covid-19而遭受的现金流损失的方法。该分析基于公私合作伙伴关系(PPP),该合作伙伴关系是由葡萄牙市政当局和一家私营公司签署的,旨在利用地面停车场。该合同没有财务基础。文章的结论是,基本情况不是计算这类赔偿的障碍,承包商以前的业绩是估计损失的合理基础,延长至2026年的预测是估计请愿人所要求的特许期延长的良好模式。仲裁法院裁决公司的索赔有正当理由作出公平的裁决。©2023,Lexxion Verlagsgesellschaft mbH。版权所有。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Ukraine ∙ Challenges in Attracting the Private Sector to Infrastructure Recovery in Ukraine The Possibility of Imposing a Fine on Both Parties Due to Unlawful Contract Amendment (Case C-263/19 T-Systems Magyarország) Switzerland ∙ The Revised Swiss Public Procurement Law: More Quality and Sustainability The Opportunity of the Recovery and Resilience Facility and the Adaptation of the Spanish Public Procurement Framework Proving Compliance with the Condition of Economic Dependence in In-House Contracts
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1