{"title":"Significance and Countermeasures of Strengthening Process Settlement","authors":"Xiong Lili","doi":"10.1109/ICMTMA.2015.239","DOIUrl":null,"url":null,"abstract":"This paper analyses the main reasons of the ineffective implement of current settlement process, summarizes the significance of process settlement in project cost control and project pricing audit, and puts forward some countermeasures to strengthen the process settlement from the aspects of a project contract signing in bidding, settlement auditing during the construction process and engineering dispute handling in construction processing.","PeriodicalId":196962,"journal":{"name":"2015 Seventh International Conference on Measuring Technology and Mechatronics Automation","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-06-13","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 Seventh International Conference on Measuring Technology and Mechatronics Automation","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICMTMA.2015.239","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This paper analyses the main reasons of the ineffective implement of current settlement process, summarizes the significance of process settlement in project cost control and project pricing audit, and puts forward some countermeasures to strengthen the process settlement from the aspects of a project contract signing in bidding, settlement auditing during the construction process and engineering dispute handling in construction processing.