Uncertainty Evaluation to Improve Geological Understanding for More Reliable Hydrocarbon Reserves Assessment: Case Study

E. Kharyba, S. Frolov, M. Blagojević, J. Kukavic, R. Yagfarov, A. Belanozhka
{"title":"Uncertainty Evaluation to Improve Geological Understanding for More Reliable Hydrocarbon Reserves Assessment: Case Study","authors":"E. Kharyba, S. Frolov, M. Blagojević, J. Kukavic, R. Yagfarov, A. Belanozhka","doi":"10.3997/2214-4609.201902183","DOIUrl":null,"url":null,"abstract":"Summary The purpose of this project was to calculate oil reserves in order to make a decision on further workover activities. The main uncertainties faced were: permeability and porosity due to the lack of core from the target interval, PVT parameters due to the absence of downhole oil sample, 2D seismic profiles instead of 3D. In addition, there were risks connected to the proximity of OWC and faults possibly intersecting the wellbore.","PeriodicalId":186806,"journal":{"name":"Petroleum Geostatistics 2019","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-09-02","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Petroleum Geostatistics 2019","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.3997/2214-4609.201902183","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Summary The purpose of this project was to calculate oil reserves in order to make a decision on further workover activities. The main uncertainties faced were: permeability and porosity due to the lack of core from the target interval, PVT parameters due to the absence of downhole oil sample, 2D seismic profiles instead of 3D. In addition, there were risks connected to the proximity of OWC and faults possibly intersecting the wellbore.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
不确定性评价提高地质认识,实现更可靠的油气储量评价:案例研究
该项目的目的是计算石油储量,以便决定下一步的修井活动。主要的不确定性因素包括:目标层段缺少岩心导致的渗透率和孔隙度;缺少井下油样导致的PVT参数;2D而非3D地震剖面。此外,存在与OWC附近和可能与井筒相交的断层相关的风险。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Forward Model Applied to Channelized Turbidite Systems: A Case Study of the Benin Major Valley Fill Stochastic Seismic Inversion Based on a Fuzzy Model A Bayesian Approach for Full-waveform Inversion Using Wide-aperture Seismic Data Ensemble-based Kernel Learning to Handle Rock-physics-model Imperfection in Seismic History Matching: A Real Field Case Study Features of Factor Models in Seismic
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1