{"title":"Lean Production-Based Ship-Hull Section Assignments Decomposition","authors":"Qingtao Gong, Mei Meng, Zhigang Li","doi":"10.1109/ICICSE.2015.61","DOIUrl":null,"url":null,"abstract":"For the hull section, in order to ensure the balance and rhythm of the logistics operation and then match the logistics operation, it is necessary to optimize the designing according to the lean production concept, which is under the premise that the construction process is relatively fixed. This paper is based on the principle and method with leading type of work decomposition, with the help of the concept of lean production, and combined with the hull section construction practice, we studied the general rule about the leading type of work decomposition and approach and method for the decomposition of hull sections; At the same time, using the similarity theory, doing a research on the group of the task package and the decomposition of the hull of the ship hull which has been applied.","PeriodicalId":159836,"journal":{"name":"2015 Eighth International Conference on Internet Computing for Science and Engineering (ICICSE)","volume":"07 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 Eighth International Conference on Internet Computing for Science and Engineering (ICICSE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICICSE.2015.61","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
For the hull section, in order to ensure the balance and rhythm of the logistics operation and then match the logistics operation, it is necessary to optimize the designing according to the lean production concept, which is under the premise that the construction process is relatively fixed. This paper is based on the principle and method with leading type of work decomposition, with the help of the concept of lean production, and combined with the hull section construction practice, we studied the general rule about the leading type of work decomposition and approach and method for the decomposition of hull sections; At the same time, using the similarity theory, doing a research on the group of the task package and the decomposition of the hull of the ship hull which has been applied.