{"title":"A faster, cheaper and safer route to CE","authors":"Steve Evans, F. Lettice, P. Smart","doi":"10.1108/09642369310081891","DOIUrl":null,"url":null,"abstract":"Describes the FAST concurrent engineering (CE) implementation methodology that has been developed by the authors at Cranfield University, through research and consultancy activities. The methodology is presented in a paper‐based work‐book and describes three stages a company could proceed through to take it from an initial interest in CE, to the successful implementation of a pilot CE product development project and then expansion. The focus is on the introduction of multidisciplinary product development teams as the main vehicle for radically improving product development performance.","PeriodicalId":113037,"journal":{"name":"World Class Design To Manufacture","volume":"2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1995-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"World Class Design To Manufacture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/09642369310081891","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
Describes the FAST concurrent engineering (CE) implementation methodology that has been developed by the authors at Cranfield University, through research and consultancy activities. The methodology is presented in a paper‐based work‐book and describes three stages a company could proceed through to take it from an initial interest in CE, to the successful implementation of a pilot CE product development project and then expansion. The focus is on the introduction of multidisciplinary product development teams as the main vehicle for radically improving product development performance.