{"title":"ALTERNATIF PENANGANAN LOSSES AKIBAT KETIDAKSEIMBANGAN BEBAN PADA TRAFO DISTRIBUSI","authors":"Anang Dasa Novfowan, Mochammad Mieftah, Wijaya Kusuma","doi":"10.33795/jtia.v9i1.17","DOIUrl":null,"url":null,"abstract":"\n \n \nThe unbalanced load on distribution transformers is mostly caused of connecting new customers and changing patterns of electricity usage in the community. The impact of the unbalanced load is the emergence of a current flowing on the transformer neutral conductor that causes energy losses. Load balancing of distribution transformers is commonly done by technicians, but the implementation takes quite a long time and is repeated, sometimes up to 4-5 times to get the appropriate results. This is more due to less valid customer phase data. Customer phase verification is needed to accelerate the load balancing process in an effort to reduce losses in distribution transformers. With valid customer phase data, just one stage of load balancing can reduce losses by 1.06%. \n \n \n","PeriodicalId":403475,"journal":{"name":"Jurnal Teknik Ilmu Dan Aplikasi","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Teknik Ilmu Dan Aplikasi","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.33795/jtia.v9i1.17","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

The unbalanced load on distribution transformers is mostly caused of connecting new customers and changing patterns of electricity usage in the community. The impact of the unbalanced load is the emergence of a current flowing on the transformer neutral conductor that causes energy losses. Load balancing of distribution transformers is commonly done by technicians, but the implementation takes quite a long time and is repeated, sometimes up to 4-5 times to get the appropriate results. This is more due to less valid customer phase data. Customer phase verification is needed to accelerate the load balancing process in an effort to reduce losses in distribution transformers. With valid customer phase data, just one stage of load balancing can reduce losses by 1.06%.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
由重量失衡引起的替代失衡处理
配电变压器负荷不平衡主要是由于接入新用户和改变社区用电模式造成的。不平衡负载的影响是在变压器中性点导体上产生电流,造成能量损失。配电变压器的负载平衡通常由技术人员完成,但实施时间相当长,而且要重复,有时多达4-5次才能得到适当的结果。这主要是由于有效的客户阶段数据较少。客户相位验证需要加速负载平衡过程,以减少配电变压器的损耗。使用有效的客户阶段数据,只需一个阶段的负载平衡就可以减少1.06%的损失。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
H2O ALGORITHM FOR JATROPHA CURCAS DISEASE IDENTIFICATION WITH FEATURE SELECTION USING GENETIC ALGORITHM PENERAPAN DESIGN THINKING DENGAN USABILITY TESTING MENGGUNAKAN SYSTEM USABILITY SCALE PADA ANTARMUKA APLIKASI ‘CURHAT’ PENERAPAN METODE WEIGHTED SUM MODEL PADA SISTEM SELEKSI SUPPLIER DI UD. SUMBER BESI BERBASIS WEB DESAIN DAN IMPLEMENTASI ANTENA MICROSTRIP ARRAY 8 ELEMEN PADA FREKUENSI 2,4 GHZ UNTUK MENUNJANG WIRELESS LOCAL AREA NETWORK ANALISIS PERPINDAHAN MASSA DAN UJI ORGANOLEPTIK PEMBUATAN NUGGET IKAN LAUT MENGGUNAKAN DEEP FAT FRYING
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1