Analysis of Current and Potential Characteristics of UHVAC GIL Tunnel Project

Xuefang Tong, Xiaohui Dong, Bo Tan
{"title":"Analysis of Current and Potential Characteristics of UHVAC GIL Tunnel Project","authors":"Xuefang Tong, Xiaohui Dong, Bo Tan","doi":"10.1109/ACPEE51499.2021.9437127","DOIUrl":null,"url":null,"abstract":"In order to master the safety of the GIL shell grounding system of the 1000kV AC UHV GIL tunnel project and support the design and construction of the project, a shell grounding system model consisting of the main grounding grid of connection stations on both sides, the tower grounding grid of overhead ground wires on both sides and the tunnel grounding grid is established. The GIL current and potential distribution under normal operation and short-circuit fault are calculated, and the influence and setting of grounding poles and three-phase connection poles are analyzed. The results show that: under normal operation, the current of connection poles and grounding poles along the GIL presents a U-shaped distribution. In case of short-circuit fault, besides the two ends, the current of the connection poles and grounding poles near the fault point also presents a peak, which can reach hundreds of amperes; and the distribution of potential and potential difference along the GIL also presents a similar U-shaped feature. The spacing of grounding poles can be set within 300m, which can ensure that the potential difference is within the safety limit. The copper bar of 50mm×5mm can be selected for both the grounding pole and the intermediate connecting pole, and the conductor with larger cross section is needed for the connection pole at both ends due to the long-term passing current close to the rated value.","PeriodicalId":127882,"journal":{"name":"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACPEE51499.2021.9437127","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

In order to master the safety of the GIL shell grounding system of the 1000kV AC UHV GIL tunnel project and support the design and construction of the project, a shell grounding system model consisting of the main grounding grid of connection stations on both sides, the tower grounding grid of overhead ground wires on both sides and the tunnel grounding grid is established. The GIL current and potential distribution under normal operation and short-circuit fault are calculated, and the influence and setting of grounding poles and three-phase connection poles are analyzed. The results show that: under normal operation, the current of connection poles and grounding poles along the GIL presents a U-shaped distribution. In case of short-circuit fault, besides the two ends, the current of the connection poles and grounding poles near the fault point also presents a peak, which can reach hundreds of amperes; and the distribution of potential and potential difference along the GIL also presents a similar U-shaped feature. The spacing of grounding poles can be set within 300m, which can ensure that the potential difference is within the safety limit. The copper bar of 50mm×5mm can be selected for both the grounding pole and the intermediate connecting pole, and the conductor with larger cross section is needed for the connection pole at both ends due to the long-term passing current close to the rated value.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
特暖通隧道工程电流、电位特性分析
为了掌握1000kV交流特高压GIL隧道工程GIL壳接地系统的安全性,支持工程的设计和施工,建立了由两侧连接站主接地网、两侧架空接地线塔式接地网和隧道接地网组成的GIL壳接地系统模型。计算了正常运行和短路故障下的GIL电流和电位分布,分析了接地极和三相接地极的影响及设置。结果表明:在正常工作情况下,沿GIL的连接极和接极电流呈u型分布。发生短路故障时,除两端外,故障点附近的连接极和接地极电流也出现峰值,可达数百安培;电势和电位差沿GIL的分布也呈现类似的u型特征。接地极间距可设置在300m以内,可保证电位差在安全限值内。接地极和中间连接极均可选用50mm×5mm铜排,由于长期通过电流接近额定值,两端连接极需选用截面较大的导体。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Transient Stability Emergency Control Based on Real-time Power Angle Trajectory Fitting Topology Identification Method for Primary Distribution Network with Limited Smart Meter Data The Steady State Limits Application of 18-pulse Rectifier in Aircraft Radar Power Supply System Yardstick motivation evaluation method for investment of distribution network A Power and Load Optimization Scheduling Model based on Flexible Thermal Load Participating in Assisted Peak Regulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1