{"title":"Schedule management in Telecommunication engineering project — a case study of local network design project","authors":"Liu Yuan, Zhang Huarong","doi":"10.1109/IMCEC.2016.7867277","DOIUrl":null,"url":null,"abstract":"This study takes the local network design project of C Telecommunication operator in Yunnan (China) in 2014 as an example, uses a combination of schedule management principle and related methods to analysis how to ensure the quality and control the cost at the same time. In order to win customers in the fierce competition of telecommunication design market, some activities must be carried out, like project decomposition, job ranking, duration estimation, scheduling and others. And some measures helps to optimize the schedule management of the design project are also very important, like baseline setting, regular meeting and process tracking.","PeriodicalId":218222,"journal":{"name":"2016 IEEE Advanced Information Management, Communicates, Electronic and Automation Control Conference (IMCEC)","volume":"79 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2016 IEEE Advanced Information Management, Communicates, Electronic and Automation Control Conference (IMCEC)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/IMCEC.2016.7867277","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0
Abstract
This study takes the local network design project of C Telecommunication operator in Yunnan (China) in 2014 as an example, uses a combination of schedule management principle and related methods to analysis how to ensure the quality and control the cost at the same time. In order to win customers in the fierce competition of telecommunication design market, some activities must be carried out, like project decomposition, job ranking, duration estimation, scheduling and others. And some measures helps to optimize the schedule management of the design project are also very important, like baseline setting, regular meeting and process tracking.