{"title":"Planning and Procedures for the Initial Startup of Subsea Production Systems","authors":"H. Duhon, J. Garduno, Noel R. Robinson","doi":"10.2118/123790-PA","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":335535,"journal":{"name":"Spe Projects Facilities & Construction","volume":"121 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Spe Projects Facilities & Construction","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.2118/123790-PA","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}