Modelling Risk Allocation Decisions in Public–Private Partnership Contracts using the Fuzzy Set Approach

E. Ameyaw, A. Chan
{"title":"Modelling Risk Allocation Decisions in Public–Private Partnership Contracts using the Fuzzy Set Approach","authors":"E. Ameyaw, A. Chan","doi":"10.1108/978-1-78743-868-220181009","DOIUrl":null,"url":null,"abstract":"Abstract \nAllocating risk in public–private partnership (PPP) projects based on public–private parties’ risk management (RM) capabilities is a condition for success of these projects. In practice, however, risks are allocated to these parties beyond their respective RM capabilities. Too much risk is often assigned to the private or public party, resulting in poor RM and costly contract renegotiations and terminations. This chapter proposes a methodology based on fuzzy set theory (FST) in which decision makers (DMs) use linguistic variables to assess and calculate RM capability values of public–private parties for risk events and to arrive at risk allocation (RA) decisions. The proposed methodology is based on integrating RA decision criteria, the Delphi method and the fuzzy synthetic evaluation (FSE) technique. The application of FSE allows for the introduction of linguistic variables that express DMs’ evaluations of RM capabilities. This provides a means to deal with the problems of qualitative, multi-criteria analysis, subjectivity and uncertainty that characterise decision-making in the construction domain. The methodology is outlined and demonstrated based on empirical data collected through a three-round Delphi survey. The public–private parties’ RM capability values for land acquisition risk are calculated using the proposed methodology. The methodology is helpful for performing fuzzy-based analysis in PPP projects, even in the event of limited or no data. This chapter makes the contribution of presenting a RA decision-making methodology that is easy to understand and use in PPP contracting and that enables DMs to track calculations of RM capability values.","PeriodicalId":301967,"journal":{"name":"Fuzzy Hybrid Computing in Construction Engineering and Management","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-04","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Fuzzy Hybrid Computing in Construction Engineering and Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/978-1-78743-868-220181009","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract Allocating risk in public–private partnership (PPP) projects based on public–private parties’ risk management (RM) capabilities is a condition for success of these projects. In practice, however, risks are allocated to these parties beyond their respective RM capabilities. Too much risk is often assigned to the private or public party, resulting in poor RM and costly contract renegotiations and terminations. This chapter proposes a methodology based on fuzzy set theory (FST) in which decision makers (DMs) use linguistic variables to assess and calculate RM capability values of public–private parties for risk events and to arrive at risk allocation (RA) decisions. The proposed methodology is based on integrating RA decision criteria, the Delphi method and the fuzzy synthetic evaluation (FSE) technique. The application of FSE allows for the introduction of linguistic variables that express DMs’ evaluations of RM capabilities. This provides a means to deal with the problems of qualitative, multi-criteria analysis, subjectivity and uncertainty that characterise decision-making in the construction domain. The methodology is outlined and demonstrated based on empirical data collected through a three-round Delphi survey. The public–private parties’ RM capability values for land acquisition risk are calculated using the proposed methodology. The methodology is helpful for performing fuzzy-based analysis in PPP projects, even in the event of limited or no data. This chapter makes the contribution of presenting a RA decision-making methodology that is easy to understand and use in PPP contracting and that enables DMs to track calculations of RM capability values.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于模糊集方法的公私合营合同风险分配决策建模
摘要基于公私合营各方风险管理能力的PPP项目风险分配是PPP项目成功的前提条件。然而,在实践中,风险被分配给这些各方,超出了它们各自的RM能力。太多的风险往往被分配给私人或公共方,导致RM不足和昂贵的合同重新谈判和终止。本章提出了一种基于模糊集理论(FST)的方法,其中决策者(DMs)使用语言变量来评估和计算公私各方对风险事件的RM能力值,并得出风险分配(RA)决策。该方法综合了RA决策准则、德尔菲法和模糊综合评价技术。FSE的应用允许引入语言变量来表达dm对RM能力的评估。这提供了一种方法来处理定性、多标准分析、主观性和不确定性等问题,这些问题是建筑领域决策的特征。通过三轮德尔菲调查收集的经验数据,概述并论证了该方法。使用所提出的方法计算了公私各方的土地征用风险管理能力值。该方法有助于在PPP项目中进行模糊分析,即使在数据有限或没有数据的情况下也是如此。本章提出了一种易于理解和在PPP合同中使用的RA决策方法,使dm能够跟踪RM能力值的计算。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Fuzzy Analytic Hierarchy Process in the Investment Appraisal of Drilling Methods Introduction to Fuzzy Logic in Construction Engineering and Management Fuzzy Consensus and Fuzzy Aggregation Processes for Multi-criteria Group Decision-making Problems in Construction Engineering and Management Index Fuzzy Arithmetic Operations: Theory and Applications in Construction Engineering and Management
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1