{"title":"A determining model on total investment, project life, and concession period interval for BOT projects","authors":"Haijun Bao, Hongdi Wang","doi":"10.1109/ICCIT.2010.5711161","DOIUrl":null,"url":null,"abstract":"To properly determine the concession period is one of the most important questions of BOT (Build-Operate-Transfer) projects. Project life and total investment are always pre-given in extant models such as ACM and RCM, which needs more discussion. Social benefit is one crucial factor for a host government to accelerate infrastructure construction by the BOT mechanism, which has been much more concerned by scholars. In this article, a determining model on total investment, project life, and concession period interval for BOT projects has been established. We unlock the premise that total investment and project life are pre-given, and aim to maximize the total benefit of the host government including economic and social benefit while ensuring that the private enterprises will receive a certain profit, finally determining the ideal project life and total investment, hence obtaining the concession period interval. The determining model enables a better progress of the negotiation between the host government and private enterprises.","PeriodicalId":131337,"journal":{"name":"5th International Conference on Computer Sciences and Convergence Information Technology","volume":"5 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-11-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"5th International Conference on Computer Sciences and Convergence Information Technology","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICCIT.2010.5711161","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5
Abstract
To properly determine the concession period is one of the most important questions of BOT (Build-Operate-Transfer) projects. Project life and total investment are always pre-given in extant models such as ACM and RCM, which needs more discussion. Social benefit is one crucial factor for a host government to accelerate infrastructure construction by the BOT mechanism, which has been much more concerned by scholars. In this article, a determining model on total investment, project life, and concession period interval for BOT projects has been established. We unlock the premise that total investment and project life are pre-given, and aim to maximize the total benefit of the host government including economic and social benefit while ensuring that the private enterprises will receive a certain profit, finally determining the ideal project life and total investment, hence obtaining the concession period interval. The determining model enables a better progress of the negotiation between the host government and private enterprises.