Evaluasi Beban Kerja Pekerja Divisi Quality Control PT. X dengan Metode Work Sampling

M. Taruna
{"title":"Evaluasi Beban Kerja Pekerja Divisi Quality Control PT. X dengan Metode Work Sampling","authors":"M. Taruna","doi":"10.25170/METRIS.V22I01.2670","DOIUrl":null,"url":null,"abstract":"This study aimed to determine the workload of the workers to be used for incentive plan in the Quality Control Division, Company X. Studying work characteristics, a work sampling technique was used. Two workers from this QC division were participated in the study. A number of 440 observation were taken from each Worker 1 and Worker 2. Results showed that the percentages of productive time are 93.62% for Worker 1 and 91.81% for Worker 2. Meanwhile for workload resulted 151% and 138% for Worker 1 and Worker 2 (classified as overload for both workers). This study recommended the company to add one more worker to help in this workstation to reduce the workload of these two workers","PeriodicalId":402087,"journal":{"name":"Jurnal METRIS","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-08-11","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal METRIS","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25170/METRIS.V22I01.2670","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This study aimed to determine the workload of the workers to be used for incentive plan in the Quality Control Division, Company X. Studying work characteristics, a work sampling technique was used. Two workers from this QC division were participated in the study. A number of 440 observation were taken from each Worker 1 and Worker 2. Results showed that the percentages of productive time are 93.62% for Worker 1 and 91.81% for Worker 2. Meanwhile for workload resulted 151% and 138% for Worker 1 and Worker 2 (classified as overload for both workers). This study recommended the company to add one more worker to help in this workstation to reduce the workload of these two workers
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
PT. X .高质量工作人员负荷评估与抽样工作方法
本研究旨在确定x公司品管部用于激励计划的工人工作量,研究工作特征,采用工作抽样技术。该QC部门的两名工作人员参与了研究。工位1和工位2各进行了440次观察。结果表明,工人1的生产时间占比为93.62%,工人2的生产时间占比为91.81%。同时,工人1和工人2的工作量分别为151%和138%(对两名工人来说都被归类为超负荷)。本研究建议公司在该工作站增加一名工人,以减少这两名工人的工作量
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Penerapan Rantai Markov Pada Pola Perpindahan Pembelian di Produk Songkok The Application of Sentiment Analysis on Customers Responses in Social Media (Case Study: Indihome and First Media Internet Service Provider) PENJADWALAN PERAWAT BERDASARKAN MINIMASI PELANGGARAN PERATURAN DAN MINIMASI BIAYA LEMBUR Natural Tourism Potential Assessment Model in Rembang Regency Analisis Peramalan Dengan Simulasi Monte Carlo dan Implementasi Pengendalian Persediaan Gula Berdasarkan EOQ
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1