Ecodrainage Model to Handle the Inundations in the City Center of Demak

Risa Niken R. T. H., S. Wahyudi, Hermin Poejiastoeti
{"title":"Ecodrainage Model to Handle the Inundations in the City Center of Demak","authors":"Risa Niken R. T. H., S. Wahyudi, Hermin Poejiastoeti","doi":"10.30659/jacee.2.2.85-96","DOIUrl":null,"url":null,"abstract":"The growth and development of the city is strongly influenced by an increase in population in line with the increasing demand for space and land. On the other hand, the availability of urban land is very limited, resulting in the conversion of land use to meet those needs. It is necessary to change the paradigm of the concept of a conventional drainage system to the concept of an environmentally friendly drainage system (ecodrainage). The ecodrainage concept is expected to be an effort to deal with inundation and groundwater conservation in city center of Demak. The quantity of the rainwater infiltration wells (RIW) was obtained based on the analysis to reduce the inundation in the city center of Demak. With the reference to the rainfall repetition period (RRP) of 2 years, 21 units of the well were needed to accommodate the rainwater runoff discharges of 0.878 m3/s. Due to the land limits at the area of research, only could 20 units of the well be constructed, as a result, it could only reduce the inundation by 0.811 m3/s or 90.48 %. Considering the rainfall repetition period (RRP) of 5 years, around 40 units of rainwater infiltration wells (RIW) were needed to accommodate the rainwater runoff discharge of 1.70 m3/s, yet only could 35 out of 40 wells as required be constructed, consequently, it was only able to reduce the inundation of 1.494 m3/s or 87.50.","PeriodicalId":349112,"journal":{"name":"Journal of Advanced Civil and Environmental Engineering","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2019-11-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Advanced Civil and Environmental Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.30659/jacee.2.2.85-96","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The growth and development of the city is strongly influenced by an increase in population in line with the increasing demand for space and land. On the other hand, the availability of urban land is very limited, resulting in the conversion of land use to meet those needs. It is necessary to change the paradigm of the concept of a conventional drainage system to the concept of an environmentally friendly drainage system (ecodrainage). The ecodrainage concept is expected to be an effort to deal with inundation and groundwater conservation in city center of Demak. The quantity of the rainwater infiltration wells (RIW) was obtained based on the analysis to reduce the inundation in the city center of Demak. With the reference to the rainfall repetition period (RRP) of 2 years, 21 units of the well were needed to accommodate the rainwater runoff discharges of 0.878 m3/s. Due to the land limits at the area of research, only could 20 units of the well be constructed, as a result, it could only reduce the inundation by 0.811 m3/s or 90.48 %. Considering the rainfall repetition period (RRP) of 5 years, around 40 units of rainwater infiltration wells (RIW) were needed to accommodate the rainwater runoff discharge of 1.70 m3/s, yet only could 35 out of 40 wells as required be constructed, consequently, it was only able to reduce the inundation of 1.494 m3/s or 87.50.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
丹麦市中心处理洪水的生态排水模型
随着对空间和土地的需求不断增加,人口的增长对城市的增长和发展产生了强烈的影响。另一方面,城市土地的可用性非常有限,导致改变土地用途以满足这些需要。有必要将传统排水系统的概念范式转变为环境友好型排水系统(生态排水)的概念。生态排水概念预计将成为应对洪水和保护德马克市中心地下水的努力。在分析的基础上,得到了德马克市中心雨水入渗井(RIW)的数量,以减少城市的淹没。参考2年降雨重复周期(RRP),需要21个单元的井来容纳0.878 m3/s的雨水径流排放。由于研究区域的土地限制,只能建设20套井,因此只能减少0.811 m3/s的淹没,即减少90.48%。考虑到降雨重复周期(RRP)为5年,需要约40套雨水入渗井(RIW)来容纳1.70 m3/s的雨水径流,而40口井中仅能建造35口,因此只能减少1.494 m3/s或87.50。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Effect of Polypropylene Fibre on Self- Compacting High-performance Concrete Optimization of Technical Calculation of Precast Wall Application for Kawo Secondary Canal Improvement in Sempor Irrigation Area, Kebumen, Central Java Comparative Analysis of Set-Back Field Jumps In Multi-Storey Building Structures Due To Earthquake Load Numerical Simulation of the Effect of Variation in Subgrade CBR Values on Rigid Pavement Technical Properties of Normal Concrete with Alum Additive
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:604180095
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1