A Review on Time and Cost Issues of Infrastructure Projects

A. Mishra
{"title":"A Review on Time and Cost Issues of Infrastructure Projects","authors":"A. Mishra","doi":"10.24321/2456.9925.201807","DOIUrl":null,"url":null,"abstract":"The research is a review research conducted on the issues of time and cost performance of infrastructure projects in global and local context using content analysis. Time extension is a serious issue and further research for specific project should be conducted to search the effective measures in the area. During project based study the quality part should be assured as time and cost may be affected by or can affect quality of the project. The review has highlighted several factors affecting time overrun and cost overrun along with the relation between the same. Time, Cost and Quality are three sides of a project performance triangle. Project is one time unique process with specific objective which is source of innovation and development. Time extension is not an exception but norms for infrastructure projects should be verified through ecological testing and possible measures should be strongly enforced for systematic performance improvements of projects. The study will be significant for policy maker and professional project managers working in the sector of infrastructure development projects.","PeriodicalId":267306,"journal":{"name":"Journal of Advanced Research in Construction and Urban Architecture","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-12-22","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Advanced Research in Construction and Urban Architecture","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.24321/2456.9925.201807","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

The research is a review research conducted on the issues of time and cost performance of infrastructure projects in global and local context using content analysis. Time extension is a serious issue and further research for specific project should be conducted to search the effective measures in the area. During project based study the quality part should be assured as time and cost may be affected by or can affect quality of the project. The review has highlighted several factors affecting time overrun and cost overrun along with the relation between the same. Time, Cost and Quality are three sides of a project performance triangle. Project is one time unique process with specific objective which is source of innovation and development. Time extension is not an exception but norms for infrastructure projects should be verified through ecological testing and possible measures should be strongly enforced for systematic performance improvements of projects. The study will be significant for policy maker and professional project managers working in the sector of infrastructure development projects.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基础设施项目的时间和成本问题综述
该研究是对全球和地方背景下基础设施项目的时间和成本绩效问题进行的回顾研究,使用内容分析。工期延长是一个严重的问题,应针对具体项目进行进一步研究,寻找有效的措施。在基于项目的研究中,应该保证质量部分,因为时间和成本可能会影响或可能影响项目的质量。本文着重分析了影响时间超支和成本超支的几个因素以及两者之间的关系。时间、成本和质量是项目绩效三角形的三条边。项目是具有特定目标的一次性独特过程,是创新和发展的源泉。延期也不例外,但基础设施项目的规范应该通过生态测试来验证,并应大力执行可能的措施,以系统地改善项目的绩效。这项研究对在基础设施发展项目部门工作的政策制定者和专业项目经理具有重要意义。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Impact of Thermal Retrofits for Roofs on Energy Efficiency of Residential Buildings in India Cold Bituminous Mix: A Sustainable Pavement Construction Technology BIM Integrated Drone Technology for Monitoring Construction Sites: A Case Study at Public Buildings Performance Assessment of a Signalized Intersection: A Case Study of Gandak Intersection of Birgunj, Nepal Perception of Contractors about Different Sources of Coarse Aggregates Used in Selected Building Construction Projects with in Kathmandu Valley
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1