{"title":"On-site testing and PD diagnosis of cast-resin distribution transformers","authors":"U. Kaltenborn, Tobias Miessler","doi":"10.1109/Diagnostika49114.2020.9214595","DOIUrl":null,"url":null,"abstract":"Distribution transformers undergo routine and type tests in accordance with IEC 60076 [1, 2, 3]. Amongst others, these tests include induced voltage tests combined with partial discharge (PD) measurement as well as measurement of no-load losses, load losses and short-circuit impedance.During its operation, transformer experiences operational stress and ageing processes. To be able to assess the condition of the transformer and to estimate its remaining lifetime, on-site tests are a helpful tool for transformer manufacturers as well as Distribution System Operators (DSOs) and their respective service suppliers.This paper describes a modular test system to carry out these tasks properly taking into consideration the potentially narrow installation of the test object.","PeriodicalId":428555,"journal":{"name":"2020 International Conference on Diagnostics in Electrical Engineering (Diagnostika)","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2020-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Conference on Diagnostics in Electrical Engineering (Diagnostika)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/Diagnostika49114.2020.9214595","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Distribution transformers undergo routine and type tests in accordance with IEC 60076 [1, 2, 3]. Amongst others, these tests include induced voltage tests combined with partial discharge (PD) measurement as well as measurement of no-load losses, load losses and short-circuit impedance.During its operation, transformer experiences operational stress and ageing processes. To be able to assess the condition of the transformer and to estimate its remaining lifetime, on-site tests are a helpful tool for transformer manufacturers as well as Distribution System Operators (DSOs) and their respective service suppliers.This paper describes a modular test system to carry out these tasks properly taking into consideration the potentially narrow installation of the test object.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
铸树脂配电变压器的现场测试与PD诊断
配电变压器按照IEC 60076[1,2,3]进行常规和型式试验。除此之外,这些测试包括感应电压测试与局部放电(PD)测量相结合,以及空载损耗、负载损耗和短路阻抗的测量。变压器在运行过程中会经历运行应力和老化过程。为了能够评估变压器的状况并估计其剩余寿命,现场测试对于变压器制造商、配电系统运营商(dso)及其各自的服务供应商来说是一个有用的工具。本文描述了一个模块化测试系统,以适当地执行这些任务,同时考虑到测试对象的潜在狭窄安装。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Diagnostika 2020 Blank Page Vibration Signal Processing and State Analysis Technology for On-Load Tap-Changer Improved electrical performance of BOPP films by acidic treatment at an elevated temperature Alternative Insulating Fluids – Interpretation of Test Results Research on EMC Tests for Economical High-voltage AC Current Limiter of 500kV and Above
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1