{"title":"A Study on the Proper Inspection Cycle Plan Through Reliability Analysis of One-Shot System","authors":"June-Young Lim, H. Seol","doi":"10.11627/jksie.2023.46.1.048","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":286667,"journal":{"name":"Journal of Society of Korea Industrial and Systems Engineering","volume":"13 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-03-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Society of Korea Industrial and Systems Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.11627/jksie.2023.46.1.048","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}