Penerapan Value Engineering untuk Efisiensi Biaya pada Proyek Bangunan Gedung (Studi Kasus: Proyek Pembangunan Gedung Variety Restaurant Batu Batam)

Indrastuti Indrastuti, Rina Mustifany
{"title":"Penerapan Value Engineering untuk Efisiensi Biaya pada Proyek Bangunan Gedung (Studi Kasus: Proyek Pembangunan Gedung Variety Restaurant Batu Batam)","authors":"Indrastuti Indrastuti, Rina Mustifany","doi":"10.37253/jcep.v3i1.7253","DOIUrl":null,"url":null,"abstract":"The cost efficiency of building construction projects is one of the challenges that are often faced in construction activities which of course will also faced in the construction of the Variety Restaurant in Batu Batam. Therefore, it is mandatory that every product or service meet the good standards and achieved through the fast fulfillment in terms of time and low costs. The study using Value Engineering a good solution because it aims a structured and creative problem solving effort to achieve cost efficiency in the construction of Batu Batam Variety Restaurant or in construction building in general. Value Engineering is carried out in several stages such as the information stage, the creative stage, the development stage and the presentation and proposal stages. By using the analysis of FAST Diagram and Pareto Diagrams, the two jobs that will be analyzed are sub-structure work and yard pavement work. The alternative solution chosen is to replace the bore pile foundation with the piling foundation and use asphalt as the main material for the pavement. The efficiency cost that could be obtained in the sub-structure work is Rp. 230,979,007.90,- or 19.4 % of the cost of the work reviewed while from the total overall project cost is 1.6 % and the savings in infrastructure work costs of Rp. Rp. 328,004,100,- or 12.8% of the cost of work reviewed and 2.14% of the total overall project cost. The total cost obtained from the savings in the Budget Plan after a VE analysis of Rp. 558,983,177.70,- or 3.7% of the total cost of the project.","PeriodicalId":102190,"journal":{"name":"Journal of Civil Engineering and Planning","volume":"63 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-06-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Civil Engineering and Planning","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.37253/jcep.v3i1.7253","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The cost efficiency of building construction projects is one of the challenges that are often faced in construction activities which of course will also faced in the construction of the Variety Restaurant in Batu Batam. Therefore, it is mandatory that every product or service meet the good standards and achieved through the fast fulfillment in terms of time and low costs. The study using Value Engineering a good solution because it aims a structured and creative problem solving effort to achieve cost efficiency in the construction of Batu Batam Variety Restaurant or in construction building in general. Value Engineering is carried out in several stages such as the information stage, the creative stage, the development stage and the presentation and proposal stages. By using the analysis of FAST Diagram and Pareto Diagrams, the two jobs that will be analyzed are sub-structure work and yard pavement work. The alternative solution chosen is to replace the bore pile foundation with the piling foundation and use asphalt as the main material for the pavement. The efficiency cost that could be obtained in the sub-structure work is Rp. 230,979,007.90,- or 19.4 % of the cost of the work reviewed while from the total overall project cost is 1.6 % and the savings in infrastructure work costs of Rp. Rp. 328,004,100,- or 12.8% of the cost of work reviewed and 2.14% of the total overall project cost. The total cost obtained from the savings in the Budget Plan after a VE analysis of Rp. 558,983,177.70,- or 3.7% of the total cost of the project.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
建筑工程价值的应用(案例研究:综艺餐厅建设项目)
建筑施工项目的成本效益是建筑活动中经常面临的挑战之一,当然在Batu Batam的综艺餐厅建设中也将面临挑战。因此,每一个产品或服务都必须达到良好的标准,并通过时间和低成本的快速完成来实现。使用价值工程的研究是一个很好的解决方案,因为它的目的是一个结构化的和创造性的问题解决的努力,以实现成本效益在Batu巴淡品种餐厅的建设或在建筑建筑一般。价值工程是在信息阶段、创意阶段、开发阶段、展示和建议阶段等几个阶段进行的。通过使用FAST图和帕累托图的分析,将分析两个工作是子结构工作和院子路面工作。选择的替代方案是将钻孔桩基础改为桩基础,并以沥青为路面主要材料。在子结构工程中可以获得的效率成本为Rp. 230,979,007.90,或所审查工作成本的19.4%,而从总项目成本中获得的效率成本为1.6%,基础设施工作成本的节省为Rp。328,004,100卢比,占审查工作成本的12.8%,占总项目成本的2.14%。经过VE分析,预算计划中节省的总成本为558,983,177.70卢比,占项目总成本的3.7%。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Pavement Condition Index Functional Evaluation of Runway Pavement Used Pavement Condition Index (PCI) Method (Case Study : Fatmawati Soekarno Airport Provinsi Bengkulu) The The Structure Analysis of Five Floor Mall Building in Semarang City According to SNI 1726-2019 and SNI 2847-2019 Analysis of the Effect of Shear Walls on Building Structural Deviations in High-rise Buildings Monde City Tower M2 Batam City Analysis of Pillar Foundations and Abutments in The Batu Rasang-Mambulu Village Bridge Project Tambelengan District Sampang Regency Delineation and Evaluation of Land Use and Spatial Patterns on the Flood Plains in the City of Sungai Lilin
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1