Quantifying The Reliability Contribution of Interconnectors in the Britain - Ireland Power System Using a Hindcast Approach

Nestor Sanchez, C. Dent, Amy L. Wilson
{"title":"Quantifying The Reliability Contribution of Interconnectors in the Britain - Ireland Power System Using a Hindcast Approach","authors":"Nestor Sanchez, C. Dent, Amy L. Wilson","doi":"10.1109/PMAPS47429.2020.9183434","DOIUrl":null,"url":null,"abstract":"A reliable electricity supply is a key consideration for energy system planners. At present, the value of support from other systems is of particular interest in Great Britain (GB), including from Ireland’s (IRL) Single Electricity Market, to which there is currently 1 GW of interconnection capacity. This paper presents a study of how interconnection influences risk levels in the GB and IRL systems, based on the standard Loss of Load Expectation (LOLE) and Expected Energy Unserved (EEU) indices, and a ‘hindcast’ approach for demand and wind generation. Specific areas of investigation include the effect of different resource sharing policies on risk levels, and the dependence of the value of interconnection on the wind capacities in the two systems.","PeriodicalId":126918,"journal":{"name":"2020 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2020-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2020 International Conference on Probabilistic Methods Applied to Power Systems (PMAPS)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/PMAPS47429.2020.9183434","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

A reliable electricity supply is a key consideration for energy system planners. At present, the value of support from other systems is of particular interest in Great Britain (GB), including from Ireland’s (IRL) Single Electricity Market, to which there is currently 1 GW of interconnection capacity. This paper presents a study of how interconnection influences risk levels in the GB and IRL systems, based on the standard Loss of Load Expectation (LOLE) and Expected Energy Unserved (EEU) indices, and a ‘hindcast’ approach for demand and wind generation. Specific areas of investigation include the effect of different resource sharing policies on risk levels, and the dependence of the value of interconnection on the wind capacities in the two systems.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
用后验法量化英爱电力系统互连器的可靠性贡献
可靠的电力供应是能源系统规划者的一个关键考虑因素。目前,来自其他系统的支持价值对英国(GB)特别感兴趣,包括来自爱尔兰(IRL)单一电力市场的支持,目前有1吉瓦的互联容量。本文基于标准的负荷预期损失(LOLE)和预期未服务能源(EEU)指数,以及需求和风力发电的“后预测”方法,研究了互联如何影响GB和IRL系统的风险水平。具体的研究领域包括不同的资源共享政策对风险水平的影响,以及两个系统中风电容量对互联价值的依赖。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Operating Reserve Assessment in Systems with Energy Storage and Electric Vehicles Framework and methodology for active distribution grid planning in Norway Parallel GPU Implementation for Fast Generating System Adequacy Assessment via Sequential Monte Carlo Simulation Distribution System Planning Considering Power Quality, Loadability and Economic Aspects Modelling and Simulation of Uncertainty in the Placement of Distributed Energy Resources for Planning Applications
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1