The integrated multi-quay Berth Allocation and Crane Assignment Problem: Formulation and case study

Issam Krimi, R. Benmansour, Abdessamad Ait el cadi, D. Duvivier, Nizar Elhachemi, L. Deshayes, Amine Ait Ouarrasse
{"title":"The integrated multi-quay Berth Allocation and Crane Assignment Problem: Formulation and case study","authors":"Issam Krimi, R. Benmansour, Abdessamad Ait el cadi, D. Duvivier, Nizar Elhachemi, L. Deshayes, Amine Ait Ouarrasse","doi":"10.1109/ICITM.2018.8333938","DOIUrl":null,"url":null,"abstract":"In the literature, some works deal with the integrated Berth Allocation and Crane Assignment Problem (BACAP) in container and bulk port context. Most of them consider that equipment are always available and high tide periods restriction is not imposed. In this work, we were interested by the BACAP under availability and high tide time windows restrictions in bulk port terminal. We proposed a mixed integer programming model for the problem and then, validated it by studying the real-case of Jorf lasfar Phosphate Hub (JPH). Preliminary computational experiments show some promising research opportunities.","PeriodicalId":341512,"journal":{"name":"2018 7th International Conference on Industrial Technology and Management (ICITM)","volume":"41 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-03-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 7th International Conference on Industrial Technology and Management (ICITM)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICITM.2018.8333938","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1

Abstract

In the literature, some works deal with the integrated Berth Allocation and Crane Assignment Problem (BACAP) in container and bulk port context. Most of them consider that equipment are always available and high tide periods restriction is not imposed. In this work, we were interested by the BACAP under availability and high tide time windows restrictions in bulk port terminal. We proposed a mixed integer programming model for the problem and then, validated it by studying the real-case of Jorf lasfar Phosphate Hub (JPH). Preliminary computational experiments show some promising research opportunities.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
综合多码头泊位分配与起重机分配问题:公式与案例研究
在文献中,一些工作涉及集装箱和散货港口环境下的综合泊位分配和起重机分配问题(BACAP)。他们中的大多数人认为设备总是可用的,并且涨潮期间没有限制。在这项工作中,我们对散装港口码头在可用性和高潮时间窗限制下的BACAP感兴趣。针对该问题,提出了一个混合整数规划模型,并通过Jorf lasfar磷化枢纽(JPH)的实例进行了验证。初步的计算实验显示了一些有希望的研究机会。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
An "à la Ansoff weak signal" feedforward control for pharmaceutical distribution: A pilot study on standard operating procedure for managing customer complaints A trade-off model for green supply chain design: An efficiency-versus-emission analysis Research on the gearbox fault diagnosis based on SCS-BP neural network Maintenance scheduling of flood control plant under uncertainty based on multi-objective optimization The relationships between impact factors and reflective indicators of equipment quality: A literature review
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1