Rule-based expert system for service restoration in distribution automation systems

C. S. Chen, C. H. Lin, T. Ku, M. Kang, C. Ho, C. F. Chen
{"title":"Rule-based expert system for service restoration in distribution automation systems","authors":"C. S. Chen, C. H. Lin, T. Ku, M. Kang, C. Ho, C. F. Chen","doi":"10.1109/POWERCON.2012.6401405","DOIUrl":null,"url":null,"abstract":"A rule-based expert system is developed for service restoration of distribution systems. The inference engine for a four-way line switch and other distribution components are proposed to implement proper restoration plan after the faulted location has been identified and isolated. The unfaulted but out of service areas are restored efficiently for multiple contingencies simultaneously. To assure the restoration plan can comply with operation regulation, heuristic rules based on the standard operation procedures of Taipower distribution system are included in the best first search of the expert system. For the fault contingency during summer peak season, the load shedding is executed to restore service to as many key customers and load as possible. The priority indices of each feeder and service zone are defined by the key customers within the service territory. A Taipower distribution system with 18 feeders is selected for computer simulation to demonstrate the effectiveness of the proposed methodology. It is found that the service restoration of distribution system can be obtained very efficiently by applying the proposed expert system.","PeriodicalId":176214,"journal":{"name":"2012 IEEE International Conference on Power System Technology (POWERCON)","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"4","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2012 IEEE International Conference on Power System Technology (POWERCON)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/POWERCON.2012.6401405","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 4

Abstract

A rule-based expert system is developed for service restoration of distribution systems. The inference engine for a four-way line switch and other distribution components are proposed to implement proper restoration plan after the faulted location has been identified and isolated. The unfaulted but out of service areas are restored efficiently for multiple contingencies simultaneously. To assure the restoration plan can comply with operation regulation, heuristic rules based on the standard operation procedures of Taipower distribution system are included in the best first search of the expert system. For the fault contingency during summer peak season, the load shedding is executed to restore service to as many key customers and load as possible. The priority indices of each feeder and service zone are defined by the key customers within the service territory. A Taipower distribution system with 18 feeders is selected for computer simulation to demonstrate the effectiveness of the proposed methodology. It is found that the service restoration of distribution system can be obtained very efficiently by applying the proposed expert system.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于规则的配电自动化系统服务恢复专家系统
提出了一种基于规则的配电系统服务恢复专家系统。提出了四路交换机和其他配电部件的推理机,以便在故障位置被识别和隔离后实施适当的恢复计划。在多个突发事件发生的情况下,能有效地恢复无故障的非服务区。为了保证修复计划符合运行规则,在专家系统的最佳优先搜索中加入了基于台湾配电系统标准操作程序的启发式规则。针对夏季高峰时段的突发故障,实施减载,尽可能多地恢复关键客户和关键负荷的服务。每个支线和服务区的优先级指标由服务区域内的关键客户定义。本研究选取台湾电力18条馈线的配电系统进行计算机模拟,以验证所提方法的有效性。结果表明,应用该专家系统可以有效地实现配电系统的服务恢复。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
A study on global solar radiation forecasting models using meteorological data and their application to wide area forecast Adaptive Frequency Control for Hybrid Wind-Diesel power system using system estimator Smart grid standards for home and building automation Demand response plan considering available spinning reserve for system frequency restoration Economic evaluation of grid-connected solar PV production cost in New Zealand
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1