{"title":"Soil improvement for currents dissipation through substation surge arrester on earthing system in LT 138 kV Barreiras - Rio Grande","authors":"Silva J. Maurilio, Pinheiro J. C. Mario","doi":"10.1109/SIPDA.2015.7339274","DOIUrl":null,"url":null,"abstract":"The study was accomplished in the transmission line (LT) 138 kV Barreiras - Rio Grande, placed at the Bahia west. This study shows a practical and well happened case, involving necessary stages for decrease the number turn off fortuitous in LT 138 kV Barreiras-Rio Grande.","PeriodicalId":296478,"journal":{"name":"2015 International Symposium on Lightning Protection (XIII SIPDA)","volume":"48 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Symposium on Lightning Protection (XIII SIPDA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SIPDA.2015.7339274","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The study was accomplished in the transmission line (LT) 138 kV Barreiras - Rio Grande, placed at the Bahia west. This study shows a practical and well happened case, involving necessary stages for decrease the number turn off fortuitous in LT 138 kV Barreiras-Rio Grande.