Kajian Teknis dan Ekonimi Alat Gali-Muat dan Angkut pada Tambang Bijih Nikel di PT Mitra Tambang Gemilang di Kecamatan Pagimana Kabupaten Banggai Provinsi Sulawesi Tengah

M. I. Akbar, Zaenal, Elfida Moralista
{"title":"Kajian Teknis dan Ekonimi Alat Gali-Muat dan Angkut pada Tambang Bijih Nikel di PT Mitra Tambang Gemilang di Kecamatan Pagimana Kabupaten Banggai Provinsi Sulawesi Tengah","authors":"M. I. Akbar, Zaenal, Elfida Moralista","doi":"10.29313/bcsme.v3i2.8383","DOIUrl":null,"url":null,"abstract":"Abstract. PT Mitra Tambang Gemilang was established in 2018, a company engaged as a mining contractor working on extracting minerals, especially nickel. The mining system used is an open pit mining system using the Selective Mining method. The mining operation area is in Central Sulawesi, in Luwuk Banggai to be precise. In pit 1, PT Mitra Tambang Gemilang has a production target of 600,000 BCM/year and based on mining results, the production of the Sany PC 215 C excavator loading and digging equipment is 586,455.12 BCM/year and the production of the Shacman F2000 dump truck is 581,644.08 BCM/year. year, this research was carried out with the aim of knowing the comparison of production values, comparison of ownership costs and operating costs, comparison of Present Worth Cost (PWC) and Production Unit Cost (PUC) comparisons between old and new digging and loading equipment.The company plans to replace the mechanical equipment with technical and economic assessments. Technical studies include calculating the production value of each tool and for economic studies including ownership costs, operating costs, Present Worth Cost (PWC) and Production Unit Cost (PUC) values. After knowing these values, a comparison is made between the production value and PUC of the old and new equipment so that it can be seen whether the old or new equipment is more profitable. Based on the results of technical and economic studies, the production of new loading and digging equipment was 773,139.06 BCM/year and showed a production increase of 31.83%. The production of new conveyance equipment is 769,994.96 BCM/year with an increase of 32.37%, indicating that the production target has been achieved. Production Unit Cost decreased by 44.96% for digging equipment, from Rp. 3,144.75 / BCM to Rp. 2,169.36 / BCM, while the Production Unit Cost of transportation equipment decreased by 26.28% from IDR 1,862.27 / BCM to IDR 1,469.96 /BCM. These results indicate that the tool needs to be replaced because the production of new tools is greater and the operating costs are more economical than the old tools. \nAbstrak. PT Mitra Tambang Gemilang berdiri pada tahun 2018, perusahaan yang bergerak sebagai kontraktor pertambangan yang bekerja pada penggalian mineral terutama nikel. Sistem penambangan  yang digunakan yaitu Sistem Tambang Terbuka dengan menggunakan Metode Selective Mining. Wilayah operasi penambangan berada di Sulawesi Tengah, tepatnya di Luwuk Banggai. Pada Pit 1 PT Mitra Tambang Gemilang memiliki target produksi sebesar 600.000 BCM/tahun dan  berdasarkan hasil penambangan produksi alat gali-muat Excavator Sany PC 215 C adalah 586.455,12 BCM/tahun dan produksi alat angkut Dump Truck  Shacman F2000 adalah 581.644,08 BCM/tahun, maka dilakukan penelitian ini yang bertujuan untuk mengetahui perbandingan nilai produksi, perbandingan biaya kepemilikan dan biaya operasi, perbandingan nilai Present Worth Cost (PWC) dan perbandingan Production Unit Cost (PUC) antara alat gali-muat dan alat angkut yang lama dan baru. Perusahaan merencanakan penggantian alat mekanis yang dilakukan dengan pengkajian  secara teknis dan ekonomi. Kajian teknis meliputi perhitungan nilai produksi masing-masing alat dan untuk kajian ekonomi meliputi biaya kepemilikan, biaya operasi, Present Worth Cost (PWC) dan nilai Production Unit Cost (PUC). Setelah mengetahui nilai-nilai tersebut, maka dilakukan perbandingan antara produksi dan PUC alat lama dan alat baru, sehingga dapat diketahui apakah alat lama  atau alat baru yang lebih menguntungkan. Berdasarkan hasil kajian teknis dan ekonomi, produksi alat gali-muat baru sebesar 773.139,06 BCM/tahun dan menunjukan kenaikan produksi sebesar 31,83%. Untuk produksi alat angkut baru sebesar 769.994.96 BCM/tahun dengan kenaikan sebesar 32,37% menunjukan target produksi tercapai. Production Unit Cost (PWC) mengalami penurunan sebesar 44,96% untuk alat gali-muat, dari sebesar Rp. 3.144,75 /BCM menjadi  Rp. 2.169,36 /BCM, sementara Production Unit Cost (PWC) alat angkut mengalami penurunan sebesar 26,28% dari Rp 1.862,27 /BCM menjadi Rp 1.469,96 /BCM. Hasil tersebut menunjukan alat perlu diganti karena produksi alat baru lebih besar dan biaya operasi lebih hemat  dibandingkan alat lama.","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"9 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-07-28","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bandung Conference Series: Mining Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/bcsme.v3i2.8383","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract. PT Mitra Tambang Gemilang was established in 2018, a company engaged as a mining contractor working on extracting minerals, especially nickel. The mining system used is an open pit mining system using the Selective Mining method. The mining operation area is in Central Sulawesi, in Luwuk Banggai to be precise. In pit 1, PT Mitra Tambang Gemilang has a production target of 600,000 BCM/year and based on mining results, the production of the Sany PC 215 C excavator loading and digging equipment is 586,455.12 BCM/year and the production of the Shacman F2000 dump truck is 581,644.08 BCM/year. year, this research was carried out with the aim of knowing the comparison of production values, comparison of ownership costs and operating costs, comparison of Present Worth Cost (PWC) and Production Unit Cost (PUC) comparisons between old and new digging and loading equipment.The company plans to replace the mechanical equipment with technical and economic assessments. Technical studies include calculating the production value of each tool and for economic studies including ownership costs, operating costs, Present Worth Cost (PWC) and Production Unit Cost (PUC) values. After knowing these values, a comparison is made between the production value and PUC of the old and new equipment so that it can be seen whether the old or new equipment is more profitable. Based on the results of technical and economic studies, the production of new loading and digging equipment was 773,139.06 BCM/year and showed a production increase of 31.83%. The production of new conveyance equipment is 769,994.96 BCM/year with an increase of 32.37%, indicating that the production target has been achieved. Production Unit Cost decreased by 44.96% for digging equipment, from Rp. 3,144.75 / BCM to Rp. 2,169.36 / BCM, while the Production Unit Cost of transportation equipment decreased by 26.28% from IDR 1,862.27 / BCM to IDR 1,469.96 /BCM. These results indicate that the tool needs to be replaced because the production of new tools is greater and the operating costs are more economical than the old tools. Abstrak. PT Mitra Tambang Gemilang berdiri pada tahun 2018, perusahaan yang bergerak sebagai kontraktor pertambangan yang bekerja pada penggalian mineral terutama nikel. Sistem penambangan  yang digunakan yaitu Sistem Tambang Terbuka dengan menggunakan Metode Selective Mining. Wilayah operasi penambangan berada di Sulawesi Tengah, tepatnya di Luwuk Banggai. Pada Pit 1 PT Mitra Tambang Gemilang memiliki target produksi sebesar 600.000 BCM/tahun dan  berdasarkan hasil penambangan produksi alat gali-muat Excavator Sany PC 215 C adalah 586.455,12 BCM/tahun dan produksi alat angkut Dump Truck  Shacman F2000 adalah 581.644,08 BCM/tahun, maka dilakukan penelitian ini yang bertujuan untuk mengetahui perbandingan nilai produksi, perbandingan biaya kepemilikan dan biaya operasi, perbandingan nilai Present Worth Cost (PWC) dan perbandingan Production Unit Cost (PUC) antara alat gali-muat dan alat angkut yang lama dan baru. Perusahaan merencanakan penggantian alat mekanis yang dilakukan dengan pengkajian  secara teknis dan ekonomi. Kajian teknis meliputi perhitungan nilai produksi masing-masing alat dan untuk kajian ekonomi meliputi biaya kepemilikan, biaya operasi, Present Worth Cost (PWC) dan nilai Production Unit Cost (PUC). Setelah mengetahui nilai-nilai tersebut, maka dilakukan perbandingan antara produksi dan PUC alat lama dan alat baru, sehingga dapat diketahui apakah alat lama  atau alat baru yang lebih menguntungkan. Berdasarkan hasil kajian teknis dan ekonomi, produksi alat gali-muat baru sebesar 773.139,06 BCM/tahun dan menunjukan kenaikan produksi sebesar 31,83%. Untuk produksi alat angkut baru sebesar 769.994.96 BCM/tahun dengan kenaikan sebesar 32,37% menunjukan target produksi tercapai. Production Unit Cost (PWC) mengalami penurunan sebesar 44,96% untuk alat gali-muat, dari sebesar Rp. 3.144,75 /BCM menjadi  Rp. 2.169,36 /BCM, sementara Production Unit Cost (PWC) alat angkut mengalami penurunan sebesar 26,28% dari Rp 1.862,27 /BCM menjadi Rp 1.469,96 /BCM. Hasil tersebut menunjukan alat perlu diganti karena produksi alat baru lebih besar dan biaya operasi lebih hemat  dibandingkan alat lama.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
摘要。PT Mitra Tambang Gemilang成立于2018年,是一家从事开采矿物(尤其是镍)的采矿承包商。所采用的采矿系统是采用选择性采矿法的露天采矿系统。采矿作业区域在苏拉威西中部,准确地说是在Luwuk Banggai。在1号坑,PT Mitra Tambang Gemilang的生产目标为600,000 BCM/年,根据采矿结果,三一PC 215 C挖掘机装载和挖掘设备的产量为586,455.12 BCM/年,沙克曼F2000自卸卡车的产量为581,644.08 BCM/年。年,本研究的目的是了解生产价值的比较,比较拥有成本和运营成本,比较现值成本(PWC)和生产单位成本(PUC)新旧挖掘和装载设备之间的比较。该公司计划对机械设备进行技术经济评估。技术研究包括计算每个工具的生产价值,经济研究包括拥有成本、运营成本、现值成本(PWC)和生产单位成本(PUC)值。在知道了这些数值之后,对新旧设备的产值和PUC进行比较,这样就可以看出新旧设备到底是盈利更多。根据技术经济研究结果,新增装挖设备产量773,139.06 BCM/年,增产31.83%。新增输送设备产量769,994.96 BCM/年,增长32.37%,完成生产目标。挖掘设备单位生产成本下降44.96%,从3144.75印尼盾/BCM降至2169.36印尼盾/BCM,运输设备单位生产成本下降26.28%,从1862.27印尼盾/BCM降至1469.96印尼盾/BCM。这些结果表明,由于新刀具的产量更大,操作成本比旧刀具更经济,因此需要更换刀具。Abstrak。PT Mitra Tambang Gemilang berdiri pada tahun 2018, perusahaan yang bergerak sebagai kontraktor pertambangan yang bekerja pada penggalian mineral terutama nickel。系统penambangan yang digunakan yitu系统Tambang Terbuka dengan menggunakan方法选择性开采。苏拉威西-登加的槟邦文化,是我们的民族文化。Pada Pit 1 PT Mitra Tambang Gemilang memiliki target producksi sebesar 600.000 BCM/tahun dan berddasarkan hasil penambangan producksi algali -muat挖掘机Sany PC 215 C adalah 586.455,12 BCM/tahun dan producksi alatangkut自卸卡车shakman F2000 adalah 581.644,08 BCM/tahun, maka dilakukan penelitian ini yang bertujuan untuk mengetahui perbandingan和nilai producksi, perbandingan biaya kepilikan dan biaya operasi,计算现值成本(PWC)计算生产单位成本(PUC)计算生产单位成本(PUC)彭加田,彭加田,杨,彭加田,彭加田,彭加田,彭加田。广东科技有限公司生产有限公司生产有限公司生产有限公司生产有限公司生产有限公司生产有限公司生产有限公司生产有限公司生产有限公司生产有限公司生产有限公司Setelah mengetahui nilai-nilai tersebut, maka dilakukan perbandingingan antara prokksi dan PUC alat lama danalat baru, sehinga dapat diketahui apakah alat lama atau aluntunkan yang lebih menguntunkan。Berdasarkan hasil kajian teknis dan ekonomi, producksi alat gali-muat baru sebesar 773.139,06 BCM/tahun dan menunjukan kenaikan producksi sebesar 31,83%。Untuk produksi alat angkut baru sebesar 769.994.96 BCM/tahun dengan kenaikan sebesar 32,37% menunjukan目标produksi tercapi。生产单位成本(PWC): mengalami penurunan sebesar 44,96% untuk alat gali-muat, dari sebesar Rp. 3.144,75 /BCM menjadi Rp. 2.169,36 /BCM, sementara生产单位成本(PWC): alat angkut mengalami penurunan sebesar 26,28% dari Rp. 1.86,27 /BCM menjadi Rp. 1.469,96 /BCM。Hasil tersebut menunjukan alat perlu diganti karena produksi alat baru lebih besar dan biaya operasi lebih hemat dibandingkan alat lama。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Kajian Kelayakan Ekonomi pada Kegiatan Hauling Tambang Tanah Liat PT Indocement Tunggal Prakarsa TBK Blok Pabuaran di Kecamatan Sukamakmur Kabupaten Bogor Provinsi Jawa Barat Analisis Investasi dan Kelayakan Ekonomi pada Penambangan Sirtu CV Billiant Ningrat di Kecamatan Leles Kabupaten Garut Provinsi Jawa Barat Manajemen Stockpile untuk Mencegah Terjadinya Self-Combustion di PLTU Banten 2 Labuan OMU Monitoring Korosi Discharge Conveyor F pada Tambang Batubara PT XYZ di Kabupaten Merangin Provinsi Jambi Pengaruh Bidang Diskontinu Terhadap Potensi Longsoran Baji pada Lereng Tambang Terbuka di PT Indocement Tunggal Prakarsa Desa Palimanan, Kecamatan Gempol, Kabupaten Cirebon, Provinsi Jawa Barat
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1