Understanding the elements of a digital library project plan - Part 3

H. F. Cervone
{"title":"Understanding the elements of a digital library project plan - Part 3","authors":"H. F. Cervone","doi":"10.1108/10650751211262119","DOIUrl":null,"url":null,"abstract":"Purpose – In part one of this article, the project plan aspects related to purpose, goals, and objectives as well as scope and risk assessment were explored. In this second part, the aim is to investigate the second two aspects: project products and deliverables and assumptions and constraints that will affect the project.Design/methodology/approach – The methodology of this article is based on a review of the literature as well as best practice in the field.Findings – Project products and deliverables must be accurately defined and described to ensure a successful project plan. Additionally, an often overlooked aspect of project management is defining the assumptions and constraints (both internal and external) that will affect the environment of the project implementation.Originality/value – Project managers who follow the recommendations and practices outlined in this article will help ensure the ultimate success of their project plans.","PeriodicalId":444419,"journal":{"name":"OCLC Syst. Serv.","volume":"247 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2012-08-17","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"5","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"OCLC Syst. Serv.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1108/10650751211262119","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 5

Abstract

Purpose – In part one of this article, the project plan aspects related to purpose, goals, and objectives as well as scope and risk assessment were explored. In this second part, the aim is to investigate the second two aspects: project products and deliverables and assumptions and constraints that will affect the project.Design/methodology/approach – The methodology of this article is based on a review of the literature as well as best practice in the field.Findings – Project products and deliverables must be accurately defined and described to ensure a successful project plan. Additionally, an often overlooked aspect of project management is defining the assumptions and constraints (both internal and external) that will affect the environment of the project implementation.Originality/value – Project managers who follow the recommendations and practices outlined in this article will help ensure the ultimate success of their project plans.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
理解数字图书馆项目计划的要素-第3部分
目的-在本文的第一部分中,探讨了与目的、目标和目的以及范围和风险评估相关的项目计划方面。在第二部分中,目的是调查后两个方面:项目产品和可交付成果以及将影响项目的假设和约束。设计/方法论/方法-本文的方法论是基于对文献的回顾以及该领域的最佳实践。发现——必须准确地定义和描述项目产品和可交付成果,以确保项目计划的成功。此外,项目管理的一个经常被忽视的方面是定义将影响项目实施环境的假设和约束(包括内部和外部的)。原创性/价值——遵循本文中概述的建议和实践的项目经理将有助于确保其项目计划的最终成功。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Dramatis personae Partnerships: the engaged university and library publishing Internal customer service assessment of cataloging, acquisitions, and library systems Paths of the mind Information organizations and the Lean approach to service delivery
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1