{"title":"Temporary Protective Ground Cable Impedance K-Factors for Predicting Worker Touch Voltage—Bracket Grounding (2 of 2)","authors":"P. Atwater, J. DeHaan","doi":"10.1109/JPETS.2016.2598565","DOIUrl":null,"url":null,"abstract":"The IEEE Standard 1246-2011 Guide provides a method to predict worker touch voltage at grounded worksites in high-voltage alternating current substations using impedance correction K-factors for temporary protective grounds (TPGs). This is the second of two papers that provide supportive information for the grounding models and derivations of TPG impedance equations presented in that Guide.","PeriodicalId":170601,"journal":{"name":"IEEE Power and Energy Technology Systems Journal","volume":"44 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2016-08-08","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"IEEE Power and Energy Technology Systems Journal","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/JPETS.2016.2598565","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
The IEEE Standard 1246-2011 Guide provides a method to predict worker touch voltage at grounded worksites in high-voltage alternating current substations using impedance correction K-factors for temporary protective grounds (TPGs). This is the second of two papers that provide supportive information for the grounding models and derivations of TPG impedance equations presented in that Guide.