{"title":"Development and Implementation of Distribution Grid Control Automation Algorithms","authors":"D. Bliznyuk","doi":"10.1109/RPA.2018.8537215","DOIUrl":null,"url":null,"abstract":"Reliability of electric power supply to consumers depends on reliability of distribution grids. Phase-to-phase faults (PPF) and line-to-ground faults (LGF), which occur at elements of the 6–20 kV distribution grid, may lead to a temporary loss of loads. Complete restoration of power supply is possible only after the response actions by the field service team (FST). Team personnel need a considerable amount of time (30–80 min) to isolate the fault by performing local sequential switchovers at several substations.","PeriodicalId":345204,"journal":{"name":"2018 International Youth Scientific and Technical Conference Relay Protection and Automation (RPA)","volume":"17 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-09-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2018 International Youth Scientific and Technical Conference Relay Protection and Automation (RPA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/RPA.2018.8537215","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Reliability of electric power supply to consumers depends on reliability of distribution grids. Phase-to-phase faults (PPF) and line-to-ground faults (LGF), which occur at elements of the 6–20 kV distribution grid, may lead to a temporary loss of loads. Complete restoration of power supply is possible only after the response actions by the field service team (FST). Team personnel need a considerable amount of time (30–80 min) to isolate the fault by performing local sequential switchovers at several substations.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
配电网控制自动化算法的开发与实现
向消费者供电的可靠性取决于配电网的可靠性。在6 - 20kv配电网各单元中发生的相对相故障(PPF)和线路对地故障(LGF)可能导致负荷的暂时性损失。只有经过现场服务团队(FST)的响应行动,才能完全恢复供电。团队人员需要相当多的时间(30-80分钟)通过在几个变电站执行本地顺序切换来隔离故障。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The Application of Supercapacitors for Limitation of Switching Overvoltage in dc Auxiliary Installations of Power Plants and Substations Extending Functionality and Application Scope of Synchronised Phasor Measurement Technology Perspectives for the Further Development of Monitoring System for System Regulators The Method of Creating Diagnostic Stands for Monitoring and Control Tools Using Software and Hardware Modeling Research of the Possibility of Using Synchronized Vector Meter for the Realization of Automatic Reclouser
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1