{"title":"The case for managerial flexibility in MMF-based software development projects","authors":"B. P. Barbosa, E. Schmitz, A. Alencar","doi":"10.1109/BDIM.2008.4540084","DOIUrl":null,"url":null,"abstract":"This paper presents the case for the introduction of flexibility into MMF-based software project management. It shows that, in cases of high volatility, the optimum financial return is obtained when the manager follows a flexible plan (policy) instead of a rigid one.","PeriodicalId":426943,"journal":{"name":"2008 3rd IEEE/IFIP International Workshop on Business-driven IT Management","volume":"19 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-04-07","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 3rd IEEE/IFIP International Workshop on Business-driven IT Management","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/BDIM.2008.4540084","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3
Abstract
This paper presents the case for the introduction of flexibility into MMF-based software project management. It shows that, in cases of high volatility, the optimum financial return is obtained when the manager follows a flexible plan (policy) instead of a rigid one.