{"title":"Kajian Perubahan Kuantitas Udara pada Sistem Ventilasi Area Penambangan Kubang Kicau di PT Antam Tbk UBPE Pongkor, Kabupaten Bogor, Provinsi Jawa Barat","authors":"Rafid Rabbani, Sriyanti, Elfida Moralista","doi":"10.29313/bcsme.v2i2.4388","DOIUrl":null,"url":null,"abstract":"Abstract. In the Kubang Kicau mining area at PT ANTAM Tbk UBPE Pongkor, Bogor District, West Java Province, there is a change in the quantity of air in the ventilation system. The change is due to a decrease in air flow from the blower fan with flexible duct. Air leakage in the area around the main fan causes air to return. Thus it is necessary to research changes in air quantity. The purpose of this study is to determine the decrease in air flow in the new condition blower fan 37 kW with a flexible duct distance of 100 m and a reconditioned blower fan 15 kW with a flexible duct distance of 30 m, as well as determine air leakage in the area around the main fan. Data processing is carried out to determine the tunnel area, air leakage area, flexible duct area, air flow reduction, and air leakage. The data required are tunnel dimensions, air leakage area dimensions, flexible duct distance, air velocity, and air flow from the blower fan specification (GIA SwedVent). The decrease in air discharge determined by the company is a maximum of 15%. The decrease in air flow in the blower fan 37 kW is 22.96% and the decrease in air flow in the blower fan 15 kW is 37.19%. Thus the two blower fans do not meet the standards set by the company. The amount of air leakage around the main fan is 1.391-10.601% so it still meets the standards set by the company. \nAbstrak. Pada area penambangan Kubang Kicau di PT ANTAM Tbk UBPE Pongkor, Kabupaten Bogor, Provinsi Jawa Barat, terjadi perubahan kuantitas udara pada sistem ventilasi. Perubahan tersebut karena penurunan debit udara dari blower fan dengan flexible duct. Leakage udara pada area sekitar main fan mengakibatkan udara balik. Dengan demikian perlu dilakukan penelitian perubahan kuantitas udaranya. Tujuan penelitian ini yaitu mengetahui penurunan debit udara pada blower fan 37 kW kondisi baru berjarak flexible duct 100 m dan blower fan 15 kW rekondisi berjarak flexible duct 30 m, serta mengetahui leakage udara pada area sekitar main fan. Pengolahan data dilakukan untuk menentukan luas tunnel, luas area leakage udara, luas flexible duct, penurunan debit udara, dan leakage udara. Data yang diperlukan adalah dimensi tunnel, dimensi area leakage udara, jarak flexible duct, kecepatan udara, serta debit udara dari spesifikasi blower fan (GIA SwedVent). Penurunan debit udara yang ditentukan oleh perusahaan yaitu maksimal 15%. Penurunan debit udara pada blower fan 37 kW yaitu 22,96% dan penurunan debit udara pada blower fan 15 kW yaitu 37,19%. Dengan demikian kedua blower fan tersebut tidak memenuhi standar yang ditentukan oleh perusahaan. Banyaknya leakage udara di sekitar main fan yaitu 1,391-10,601% sehingga masih memenuhi standar yang ditentukan oleh perusahaan.","PeriodicalId":187584,"journal":{"name":"Bandung Conference Series: Mining Engineering","volume":"39 1-2 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Bandung Conference Series: Mining Engineering","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.29313/bcsme.v2i2.4388","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Abstract. In the Kubang Kicau mining area at PT ANTAM Tbk UBPE Pongkor, Bogor District, West Java Province, there is a change in the quantity of air in the ventilation system. The change is due to a decrease in air flow from the blower fan with flexible duct. Air leakage in the area around the main fan causes air to return. Thus it is necessary to research changes in air quantity. The purpose of this study is to determine the decrease in air flow in the new condition blower fan 37 kW with a flexible duct distance of 100 m and a reconditioned blower fan 15 kW with a flexible duct distance of 30 m, as well as determine air leakage in the area around the main fan. Data processing is carried out to determine the tunnel area, air leakage area, flexible duct area, air flow reduction, and air leakage. The data required are tunnel dimensions, air leakage area dimensions, flexible duct distance, air velocity, and air flow from the blower fan specification (GIA SwedVent). The decrease in air discharge determined by the company is a maximum of 15%. The decrease in air flow in the blower fan 37 kW is 22.96% and the decrease in air flow in the blower fan 15 kW is 37.19%. Thus the two blower fans do not meet the standards set by the company. The amount of air leakage around the main fan is 1.391-10.601% so it still meets the standards set by the company. Abstrak. Pada area penambangan Kubang Kicau di PT ANTAM Tbk UBPE Pongkor, Kabupaten Bogor, Provinsi Jawa Barat, terjadi perubahan kuantitas udara pada sistem ventilasi. Perubahan tersebut karena penurunan debit udara dari blower fan dengan flexible duct. Leakage udara pada area sekitar main fan mengakibatkan udara balik. Dengan demikian perlu dilakukan penelitian perubahan kuantitas udaranya. Tujuan penelitian ini yaitu mengetahui penurunan debit udara pada blower fan 37 kW kondisi baru berjarak flexible duct 100 m dan blower fan 15 kW rekondisi berjarak flexible duct 30 m, serta mengetahui leakage udara pada area sekitar main fan. Pengolahan data dilakukan untuk menentukan luas tunnel, luas area leakage udara, luas flexible duct, penurunan debit udara, dan leakage udara. Data yang diperlukan adalah dimensi tunnel, dimensi area leakage udara, jarak flexible duct, kecepatan udara, serta debit udara dari spesifikasi blower fan (GIA SwedVent). Penurunan debit udara yang ditentukan oleh perusahaan yaitu maksimal 15%. Penurunan debit udara pada blower fan 37 kW yaitu 22,96% dan penurunan debit udara pada blower fan 15 kW yaitu 37,19%. Dengan demikian kedua blower fan tersebut tidak memenuhi standar yang ditentukan oleh perusahaan. Banyaknya leakage udara di sekitar main fan yaitu 1,391-10,601% sehingga masih memenuhi standar yang ditentukan oleh perusahaan.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
研究西爪哇省茂物区PT Antam kikers采矿通风系统的空气数量变化
摘要在西爪哇省茂物区PT ANTAM Tbk UBPE Pongkor的Kubang Kicau矿区,通风系统中的空气量发生了变化。这种变化是由于带有柔性风道的鼓风机的气流减少。主风机周围区域漏风导致空气回流。因此,有必要对空气量的变化进行研究。本研究的目的是确定新工况37kw、柔性风道距离100m的风机和修复后15kw、柔性风道距离30m的风机的风量减少量,并确定主风机周围区域的漏风量。进行数据处理,确定隧道面积、漏风面积、柔性风管面积、减风量、漏风量。所需数据为隧道尺寸、漏风面积尺寸、柔性风道距离、风速和鼓风机规格(GIA SwedVent)的风量。公司确定的空气排放减少量最多为15%。37 kW风机的风量减少22.96%,15 kW风机的风量减少37.19%。因此两台风机不符合公司规定的标准。主风机周围漏风量为1.391-10.601%,仍符合公司规定标准。Abstrak。帕达地区penambangan Kubang Kicau di PT ANTAM Tbk UBPE Pongkor, Kabupaten茂物,省爪哇巴拉特,terjadi perubahan kuantitas udara帕达系统通风。佩鲁巴汉特拉斯卡纳特拉努纳特拉达里鼓风机登根柔性风管。泄漏的乌达拉帕达区主要是乌达拉巴达。邓干demikian perlu dilakukan penelitian perubahan kuantitas udaranya。Tujuan penelitian ini yitu mengetahui penurunan debit udara pada鼓风机风机37kw kondisi baru berjarak柔性风道100m丹鼓风机风机15kw rekondisi berjarak柔性风道30m, serta mengetahui泄漏udara pada区域sekitar主风机。彭戈拉罕资料:双拉坎隧道、双拉坎隧道、双拉坎隧道、双拉坎隧道、双拉坎隧道、双拉坎隧道、双拉坎隧道、双拉坎隧道、单拉坎隧道。数据阳diperlukan adalah尺寸隧道,尺寸面积泄漏udara, jarak柔性风管,keepatan udara, serta debit udara达规格鼓风机(GIA SwedVent)。Penurunan借记udara yang ditentukan oleh perusahaan yyitu maksimal 15%。Penurunan借借udara帕达风机37 kW雅图22,96%;Penurunan借借udara帕达风机15 kW雅图37,19%。登安德米克杜安鼓风机是一种标准的鼓风机。banyakya泄漏udara di sekitar主要是范雅图1,391-10,601% sehinga masih memuhi标准yang ditentukan oleh perusaan。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Kajian Kelayakan Ekonomi pada Kegiatan Hauling Tambang Tanah Liat PT Indocement Tunggal Prakarsa TBK Blok Pabuaran di Kecamatan Sukamakmur Kabupaten Bogor Provinsi Jawa Barat Analisis Investasi dan Kelayakan Ekonomi pada Penambangan Sirtu CV Billiant Ningrat di Kecamatan Leles Kabupaten Garut Provinsi Jawa Barat Manajemen Stockpile untuk Mencegah Terjadinya Self-Combustion di PLTU Banten 2 Labuan OMU Monitoring Korosi Discharge Conveyor F pada Tambang Batubara PT XYZ di Kabupaten Merangin Provinsi Jambi Pengaruh Bidang Diskontinu Terhadap Potensi Longsoran Baji pada Lereng Tambang Terbuka di PT Indocement Tunggal Prakarsa Desa Palimanan, Kecamatan Gempol, Kabupaten Cirebon, Provinsi Jawa Barat
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1