A new method for independent task scheduling in nonlinearly DAG clustering

Qiang-Sheng Hua, Zhi-gang Chen, F. Lau
{"title":"A new method for independent task scheduling in nonlinearly DAG clustering","authors":"Qiang-Sheng Hua, Zhi-gang Chen, F. Lau","doi":"10.1109/ISPAN.2004.1300479","DOIUrl":null,"url":null,"abstract":"For the parallel tasks represented by the directed acyclic graph (DAG), if it is linearly clustered, the ordering of the execution time of the tasks in each cluster is based on their arrows in the DAG. But for nonlinearly clustering, the ordering of the independent tasks in each cluster is not easily decided. Improper ordering of these independent tasks will greatly increase the scheduling length of the DAG. We discuss the shortcomings of current scheduling algorithms and the reason behind poor performance, and then propose some new node information to be extracted which is used by a new independent tasks scheduling algorithm based on the maximized parallelism degree (MPD). Experimental results show that the MPD algorithm can yield better performance than the previous algorithms.","PeriodicalId":198404,"journal":{"name":"7th International Symposium on Parallel Architectures, Algorithms and Networks, 2004. Proceedings.","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2004-05-10","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"3","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"7th International Symposium on Parallel Architectures, Algorithms and Networks, 2004. Proceedings.","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ISPAN.2004.1300479","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 3

Abstract

For the parallel tasks represented by the directed acyclic graph (DAG), if it is linearly clustered, the ordering of the execution time of the tasks in each cluster is based on their arrows in the DAG. But for nonlinearly clustering, the ordering of the independent tasks in each cluster is not easily decided. Improper ordering of these independent tasks will greatly increase the scheduling length of the DAG. We discuss the shortcomings of current scheduling algorithms and the reason behind poor performance, and then propose some new node information to be extracted which is used by a new independent tasks scheduling algorithm based on the maximized parallelism degree (MPD). Experimental results show that the MPD algorithm can yield better performance than the previous algorithms.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
非线性DAG聚类中独立任务调度的新方法
对于有向无环图(DAG)表示的并行任务,如果是线性聚类,则每个集群中任务的执行时间顺序是根据DAG中的箭头来排序的。但对于非线性聚类,每个聚类中独立任务的排序不容易确定。这些独立任务排序不当将大大增加DAG的调度长度。讨论了现有调度算法的不足和性能差的原因,提出了一种新的基于最大并行度(MPD)的独立任务调度算法所需要提取的节点信息。实验结果表明,MPD算法比以往的算法具有更好的性能。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Proxy placement in coordinated en-route transcoding caching for tree networks Optimal adaptive fault diagnosis of cubic Hamiltonian graphs The spanning diameter of the star graphs Particle swarm optimization algorithm in signal detection and blind extraction An approach to achieve message efficient early-stopping uniform consensus protocols
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1