{"title":"Rehabilitation of Coal Power Plant in Kosova","authors":"N. Avdiu","doi":"10.1109/ICPST.2008.4745262","DOIUrl":null,"url":null,"abstract":"In Kosovo 97% of total electricity is generated from lignite power plant, with total install capacity 1512 MW, but with current available capacity of 834 MW. The generation system, during the past eight years, was not in position to meet domestic demand. After the war in Kosovo the shortages of production has required importation of great amount of electricity. Following the intervention of the NATO (North Atlantic Treaty Organization) in 1999 the Kosovo is administrated by the United Nations under Security Council Resolution 1244 (United Nation Interim Administration Mission in Kosovo-UNMIK), first main activities in the energy sector consisted of repairing damaged facilities, rehabilitating equipment that had been inadequately maintained during the years of conflict, restoring production at thermal power stations and in coal mines. One of the most urgent tasks in power sector for the Kosovo is rehabilitation of its thermal power plants and building new generating capacity. In the paper aim to present energy situation in Kosovo and the dilemmas of rehabilitation of old thermal power plant Kosovo A. and to investigate the feasibility of rehabilitation of coal thermal power plant Kosovo A with five units. Further in the paper will be presented: structural changes of power sector; main pieces of Kosova legislation regarding the interaction between energy conversion technologies and environment; evolution trends of the pollution generated by thermal power units; difficulties encountered in the process of alignment to the EU provisions.","PeriodicalId":107016,"journal":{"name":"2008 Joint International Conference on Power System Technology and IEEE Power India Conference","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2008-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 Joint International Conference on Power System Technology and IEEE Power India Conference","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICPST.2008.4745262","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

In Kosovo 97% of total electricity is generated from lignite power plant, with total install capacity 1512 MW, but with current available capacity of 834 MW. The generation system, during the past eight years, was not in position to meet domestic demand. After the war in Kosovo the shortages of production has required importation of great amount of electricity. Following the intervention of the NATO (North Atlantic Treaty Organization) in 1999 the Kosovo is administrated by the United Nations under Security Council Resolution 1244 (United Nation Interim Administration Mission in Kosovo-UNMIK), first main activities in the energy sector consisted of repairing damaged facilities, rehabilitating equipment that had been inadequately maintained during the years of conflict, restoring production at thermal power stations and in coal mines. One of the most urgent tasks in power sector for the Kosovo is rehabilitation of its thermal power plants and building new generating capacity. In the paper aim to present energy situation in Kosovo and the dilemmas of rehabilitation of old thermal power plant Kosovo A. and to investigate the feasibility of rehabilitation of coal thermal power plant Kosovo A with five units. Further in the paper will be presented: structural changes of power sector; main pieces of Kosova legislation regarding the interaction between energy conversion technologies and environment; evolution trends of the pollution generated by thermal power units; difficulties encountered in the process of alignment to the EU provisions.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
科索沃燃煤电厂的修复
在科索沃,总电力的97%来自褐煤发电厂,总装机容量为1512兆瓦,但目前可用容量为834兆瓦。在过去八年中,发电系统无法满足国内需求。科索沃战争后,由于生产短缺,需要进口大量电力。1999年北约组织(北大西洋公约组织)介入后,科索沃由联合国根据安全理事会第1244号决议(联合国科索沃临时行政当局特派团-科索沃特派团)管理,能源部门的第一项主要活动包括修理损坏的设施,恢复在冲突期间未得到充分维护的设备,恢复火力发电站和煤矿的生产。科索沃电力部门最紧迫的任务之一是恢复其火力发电厂和建设新的发电能力。本文旨在介绍科索沃的能源状况和旧的科索沃A热电厂修复的困境,并探讨科索沃A热电厂修复五台机组的可行性。本文将进一步介绍:电力部门的结构变化;科索沃关于能源转换技术与环境之间相互作用的主要立法;火电机组污染的演变趋势在与欧盟条款保持一致的过程中遇到的困难。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Formulas for Calculating Physical Grounding Resistance of Grounding Wire - Electric Pole System of High Voltage Transmission Lines Torque Ripple Minimization in Direct Torque Control based IM Drive Part-I: Single-rate Control Strategy Power Systems Voltage Stability Using Artificial Neural Network Ranking of Prospective New Generation Location for a Power Network in a Deregulated System Design of Genetic Algorithm Based Fuzzy Logic Power System Stabilizers in Multimachine Power System
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1