{"title":"Economic impact of 2020 renewable energy scenarios on the Spanish electricity market","authors":"P. Frías, T. Gómez, P. Linares","doi":"10.1109/EEM.2010.5558716","DOIUrl":null,"url":null,"abstract":"In order to meet the 20-20-20 European energy policy commitments Spain should continue increasing the amount of electricity production from renewable energy sources (RES) along this decade. This paper analyzes the impact of the future RES deployment on the Spanish power system. Six scenarios are defined by setting different RES installed capacity targets and considering the uncertainty in fuel prices. First, the generation mix is planned for the horizon 2010–20 calculating the investment required in conventional thermal generation for each scenario. Then the system operation, hour by hour, is simulated in 2020 for each generation mix in each scenario. Operational fuel and carbon emission costs are calculated. Costs associated with operational reserves and wind curtailment to counteract or wind power intermittency and predictability errors are also computed. Finally, total systems costs, both investment and operating costs, are compared in the considered scenarios. The economic impact on electricity prices and operational margins of actual power plants is also discussed.","PeriodicalId":310310,"journal":{"name":"2010 7th International Conference on the European Energy Market","volume":"150 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2010-06-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"7","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2010 7th International Conference on the European Energy Market","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/EEM.2010.5558716","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 7

Abstract

In order to meet the 20-20-20 European energy policy commitments Spain should continue increasing the amount of electricity production from renewable energy sources (RES) along this decade. This paper analyzes the impact of the future RES deployment on the Spanish power system. Six scenarios are defined by setting different RES installed capacity targets and considering the uncertainty in fuel prices. First, the generation mix is planned for the horizon 2010–20 calculating the investment required in conventional thermal generation for each scenario. Then the system operation, hour by hour, is simulated in 2020 for each generation mix in each scenario. Operational fuel and carbon emission costs are calculated. Costs associated with operational reserves and wind curtailment to counteract or wind power intermittency and predictability errors are also computed. Finally, total systems costs, both investment and operating costs, are compared in the considered scenarios. The economic impact on electricity prices and operational margins of actual power plants is also discussed.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
2020年可再生能源方案对西班牙电力市场的经济影响
为了实现20-20-20欧洲能源政策承诺,西班牙应该在这十年中继续增加可再生能源(RES)的发电量。本文分析了未来可再生能源部署对西班牙电力系统的影响。通过设定不同的可再生能源装机容量目标并考虑到燃料价格的不确定性,定义了六种情景。首先,对2010 - 2020年的发电组合进行了规划,计算了每种情况下常规火力发电所需的投资。然后对各方案下各发电组合在2020年的运行情况进行逐小时模拟。计算了运行燃料和碳排放成本。与运营储备和弃风相关的成本,以抵消风力发电的间歇性和可预测性误差也被计算在内。最后,在考虑的场景中比较了总系统成本,包括投资和运营成本。本文还讨论了实际电厂对电价和运营利润率的经济影响。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
The expansion of “non conventional” production of natural gas (tight gas, gas shale and coal bed methane). A silent revolution Facilitating emission trade within power exchange: Development of conceptual platform Auction of Financial Transmission Rights in electricity market environment Transmission System Operator's market functions implementation based on Service Oriented Architecture and Business Process Management Drivers of imbalance cost of wind power: A comparative analysis
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1