Computer budgeting of mineral holdings for a small scale mining operation

ACM '83 Pub Date : 1900-01-01 DOI:10.1145/800173.809694
D. McCulley
{"title":"Computer budgeting of mineral holdings for a small scale mining operation","authors":"D. McCulley","doi":"10.1145/800173.809694","DOIUrl":null,"url":null,"abstract":"This paper describes how a computer program handles the problems encountered in developing a mining budget from a large number of individual and widely scattered ore deposits. Among the difficulties overcome by the use of the program are constantly changing production forecasts requiring reworking of the budget, scheduling of the capacities of the offsite loading facilities, production rates requiring the mining of several properties concurrently while still maintaining quality control, and pressing time limits on several leases.","PeriodicalId":306306,"journal":{"name":"ACM '83","volume":"49 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"1900-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"ACM '83","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1145/800173.809694","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

This paper describes how a computer program handles the problems encountered in developing a mining budget from a large number of individual and widely scattered ore deposits. Among the difficulties overcome by the use of the program are constantly changing production forecasts requiring reworking of the budget, scheduling of the capacities of the offsite loading facilities, production rates requiring the mining of several properties concurrently while still maintaining quality control, and pressing time limits on several leases.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
为小型采矿作业编制矿物储备的计算机预算
本文描述了计算机程序如何处理从大量单个和广泛分散的矿床中制定采矿预算时遇到的问题。使用该程序所克服的困难包括不断变化的生产预测,需要重新编制预算,安排场外装载设施的能力,要求同时开采多个物业的生产率,同时保持质量控制,以及对几个租赁的紧迫时间限制。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Optical storage of page images and pictorial data - opportunities and needed advances in information retrieval Office automation and the changing definition of the workplace Why Ada is not just another programming language Session M4: Women in the workplace Network protocol: A structured approach
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1