Adjusting story points calculation in scrum effort & time estimation

Hind Zahraoui, M. Idrissi
{"title":"Adjusting story points calculation in scrum effort & time estimation","authors":"Hind Zahraoui, M. Idrissi","doi":"10.1109/SITA.2015.7358400","DOIUrl":null,"url":null,"abstract":"Effort and time estimation at the initial stage of an agile project is a difficult and challenging task due to volatility and changing in customer requirements. Scrum remains the most used agile project management method. However effort estimation in scrum is mainly based on story points which are subjective measures and mostly lead to inaccurate estimates. In this paper we propose to adjust this measure using three adjustment factors. Moreover this paper will show how to use also this adjusted story point in velocity calculation to ameliorate scrum time estimation.","PeriodicalId":174405,"journal":{"name":"2015 10th International Conference on Intelligent Systems: Theories and Applications (SITA)","volume":"449 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-10-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"34","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 10th International Conference on Intelligent Systems: Theories and Applications (SITA)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/SITA.2015.7358400","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 34

Abstract

Effort and time estimation at the initial stage of an agile project is a difficult and challenging task due to volatility and changing in customer requirements. Scrum remains the most used agile project management method. However effort estimation in scrum is mainly based on story points which are subjective measures and mostly lead to inaccurate estimates. In this paper we propose to adjust this measure using three adjustment factors. Moreover this paper will show how to use also this adjusted story point in velocity calculation to ameliorate scrum time estimation.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
调整scrum工作量和时间估算中的故事点计算
由于客户需求的不稳定性和变化,敏捷项目初始阶段的工作量和时间估计是一项困难且具有挑战性的任务。Scrum仍然是最常用的敏捷项目管理方法。然而,scrum中的工作量估算主要基于故事点,这是一种主观的度量,通常会导致不准确的估算。在本文中,我们建议使用三个调整因子来调整这一措施。此外,本文还将展示如何在速度计算中使用调整后的故事点来改进scrum时间估计。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Neural network Incremental conductance MPPT algorithm for photovoltaic water pumping system Mapping discovery methodology in a pure P2P mediation system for XML schemas Strategic Alignment and Information System project portfolio optimization model Conceptual alignment between SPEM-based processes and CMMI Towards an interpretable Rules Ensemble algorithm for classification in a categorical data space
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1