Optimization of Unit Commitment Problem for wind-thermal generation using Fuzzy optimization technique

M. S. Shahriar, M. J. Rana, M. Asif, Mahmudul Hasan, M. Hawlader
{"title":"Optimization of Unit Commitment Problem for wind-thermal generation using Fuzzy optimization technique","authors":"M. S. Shahriar, M. J. Rana, M. Asif, Mahmudul Hasan, M. Hawlader","doi":"10.1109/ICAEE.2015.7506803","DOIUrl":null,"url":null,"abstract":"The day ahead unit commitment (UC) problem is one of the biggest challenges of power system operation as it requires not only the demand of fulfilling the system constraints but also in most economical way. Adding uncertainty of renewable energy sources make it more difficult to handle. Because of the uncertain nature of Wind Energy Generator (WEG), some risk factors has been added in the solution process. So, solving UC with plants like WEG has become a vital topic of research in present days. A strategy of solving such problems is presented in this paper with having the objective of minimizing the cost and handling risks introduced due to WEGs. As a specialized formulation technique of uncertain optimization problem, Fuzzy optimization technique has been chosen and the problem has been formulated in Mixed Integer Linear Programming (MILP) technique.","PeriodicalId":123939,"journal":{"name":"2015 International Conference on Advances in Electrical Engineering (ICAEE)","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2015-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"10","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2015 International Conference on Advances in Electrical Engineering (ICAEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICAEE.2015.7506803","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 10

Abstract

The day ahead unit commitment (UC) problem is one of the biggest challenges of power system operation as it requires not only the demand of fulfilling the system constraints but also in most economical way. Adding uncertainty of renewable energy sources make it more difficult to handle. Because of the uncertain nature of Wind Energy Generator (WEG), some risk factors has been added in the solution process. So, solving UC with plants like WEG has become a vital topic of research in present days. A strategy of solving such problems is presented in this paper with having the objective of minimizing the cost and handling risks introduced due to WEGs. As a specialized formulation technique of uncertain optimization problem, Fuzzy optimization technique has been chosen and the problem has been formulated in Mixed Integer Linear Programming (MILP) technique.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
应用模糊优化技术优化风热发电机组调度问题
日前机组承诺问题是电力系统运行中面临的最大挑战之一,因为它既需要满足系统约束的要求,又需要以最经济的方式实现。加上可再生能源的不确定性,使其更难处理。由于风力发电机组的不确定性,在求解过程中加入了一些风险因素。因此,利用WEG等植物解决UC问题已成为当前研究的重要课题。本文提出了一种解决此类问题的策略,其目标是最小化成本并处理由于weg而引入的风险。模糊优化技术作为求解不确定优化问题的一种专用的表述技术,在混合整数线性规划(MILP)技术中被采用。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Problem analysis and probable solution of existing interconnected grid system of Chittagong region Development of an LCL filter for a residential Microgrid system Hardware implementation of grid connected transformer-less semi-Z-source inverter topology to mitigate common mode leakage current and THD Earthquake monitoring and warning system The next generation of irrigation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1