Investigation of performance degradation for TNB newly commissioned combined cycle power plant Case study at PD1, Tuanku Jaafar Power Station, Port Dickson
{"title":"Investigation of performance degradation for TNB newly commissioned combined cycle power plant Case study at PD1, Tuanku Jaafar Power Station, Port Dickson","authors":"C. H. Lee, Z. A. Mamat","doi":"10.1109/ICEENVIRON.2009.5398657","DOIUrl":null,"url":null,"abstract":"Phase 1 of Tuanku Jaafar Power Station, Port Dickson (PD1) is one of the newest power plants in Tenaga Nasional Berhad (TNB). This combined cycle plant with the nominal capacity of 750MW started its commercial operation in 2005. However, in less than 2 years of its operation, the plant has indicated significant capacity degradation. Consequently, TNB carried few investigations to determine the cause for the capacity degradation. This paper describes the approach taken and the outcomes of the investigations.","PeriodicalId":211736,"journal":{"name":"2009 3rd International Conference on Energy and Environment (ICEE)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2009-12-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"1","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2009 3rd International Conference on Energy and Environment (ICEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ICEENVIRON.2009.5398657","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 1
Abstract
Phase 1 of Tuanku Jaafar Power Station, Port Dickson (PD1) is one of the newest power plants in Tenaga Nasional Berhad (TNB). This combined cycle plant with the nominal capacity of 750MW started its commercial operation in 2005. However, in less than 2 years of its operation, the plant has indicated significant capacity degradation. Consequently, TNB carried few investigations to determine the cause for the capacity degradation. This paper describes the approach taken and the outcomes of the investigations.