Performance Evaluation with a Combination of Balanced Scorecard Model and the Fuzzy Best-Worst Method (Case Study: Mashhad City Train Operation Company)
{"title":"Performance Evaluation with a Combination of Balanced Scorecard Model and the Fuzzy Best-Worst Method (Case Study: Mashhad City Train Operation Company)","authors":"Sepideh Barjasteh nezhad, M. Kazemi, A. Pooya","doi":"10.52547/jimp.12.3.173","DOIUrl":null,"url":null,"abstract":"","PeriodicalId":303885,"journal":{"name":"Journal of Industrial Management Perspective","volume":"1 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2022-09-23","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Journal of Industrial Management Perspective","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.52547/jimp.12.3.173","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}