BLACK OUT OF MAN AND KOMATSU MACHINERY DUE TO FREQUENCY INSTABILITY IN THE ELECTRIC POWER SYSTEM IN FAKFAK DISTRICT PT. PLN (Persero) ULP FAKFAK

Naomi Lembang
{"title":"BLACK OUT OF MAN AND KOMATSU MACHINERY DUE TO FREQUENCY INSTABILITY IN THE ELECTRIC POWER SYSTEM IN FAKFAK DISTRICT PT. PLN (Persero) ULP FAKFAK","authors":"Naomi Lembang","doi":"10.59562/metrik.v20i3.49847","DOIUrl":null,"url":null,"abstract":"Total power outage Thursday 02 January 2022 in the Fakfak Regency electric power system due to tripping of the MAN-04 engine and the MAN-07 engine (PLN) with installed power of 528 kW, operating power of 350 kW, and due to tripping of the KOMATSU-09 engine and the KOMATSU-12 (P3) engine has an installed power of 800 kW, an operating power of 450 kW at the Cotton Garden PLTD, there is an overload on the generator engines that are still operating. This is not effective and efficient, the power generated is less than the load on the system, resulting in frequency instability, which decreases the frequency so that a black out occurs. To minimize blackout, load shedding is necessary so that the generating machines that are still operating are not overloaded and the system frequency remains normal. For this reason, it is necessary to analyze the data processing of the frequency defense scheme at PLTD Kebun Kapas and measure the load and frequency on one of the machines. at the Cotton Plantation PLTD. Frequency Normalization is carried out referring to the load shedding simulation results carried out to maintain the balance of the power generated with the load on the system. Based on the results of the study for the MAN machine, returning the frequency from the initial load shedding of 49.44 Hz to a normal frequency of 50 Hz takes 3.6 seconds, on a MAN machine on a KOMATSU machine, to return the frequency from 49.28 Hz to a normal frequency of 50 Hz, it takes 5.2 seconds on each KOMATSU machine. ","PeriodicalId":129780,"journal":{"name":"Jurnal Media Elektrik","volume":"51 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2023-08-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"Jurnal Media Elektrik","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.59562/metrik.v20i3.49847","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

Total power outage Thursday 02 January 2022 in the Fakfak Regency electric power system due to tripping of the MAN-04 engine and the MAN-07 engine (PLN) with installed power of 528 kW, operating power of 350 kW, and due to tripping of the KOMATSU-09 engine and the KOMATSU-12 (P3) engine has an installed power of 800 kW, an operating power of 450 kW at the Cotton Garden PLTD, there is an overload on the generator engines that are still operating. This is not effective and efficient, the power generated is less than the load on the system, resulting in frequency instability, which decreases the frequency so that a black out occurs. To minimize blackout, load shedding is necessary so that the generating machines that are still operating are not overloaded and the system frequency remains normal. For this reason, it is necessary to analyze the data processing of the frequency defense scheme at PLTD Kebun Kapas and measure the load and frequency on one of the machines. at the Cotton Plantation PLTD. Frequency Normalization is carried out referring to the load shedding simulation results carried out to maintain the balance of the power generated with the load on the system. Based on the results of the study for the MAN machine, returning the frequency from the initial load shedding of 49.44 Hz to a normal frequency of 50 Hz takes 3.6 seconds, on a MAN machine on a KOMATSU machine, to return the frequency from 49.28 Hz to a normal frequency of 50 Hz, it takes 5.2 seconds on each KOMATSU machine. 
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
由于法克法克地区电力系统频率不稳定导致人员和小松机械停电
2022年1月2日星期四,由于MAN-04发动机和MAN-07发动机(PLN)的跳闸,安装功率为528千瓦,运行功率为350千瓦,由于KOMATSU-09发动机和KOMATSU-12 (P3)发动机的跳闸,安装功率为800千瓦,运行功率为450千瓦,在棉花花园PLTD,仍然在运行的发电机发动机过载。这是不有效和高效的,产生的功率小于系统上的负载,导致频率不稳定,从而降低频率,使停电发生。为了尽量减少停电,必须减少负荷,使仍在运行的发电机组不会过载,系统频率保持正常。为此,有必要对PLTD Kebun Kapas的频率防御方案的数据处理进行分析,并对其中一台机器的负载和频率进行测量。在棉花种植园公司根据减载仿真结果进行频率归一化,以保持系统产生的功率与负荷的平衡。根据对MAN机器的研究结果,将频率从49.44 Hz的初始减载恢复到50 Hz的正常频率需要3.6秒,在MAN机器上,在小松机器上,将频率从49.28 Hz恢复到50 Hz的正常频率,在每台小松机器上需要5.2秒。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
DESIGN AND DEVELOPMENT OF CAMPUS ROOM USE MONITORING APPLICATION BASED ON ANDORID WITH MAGNETIC DOOR LOCK IN THE DEPARTMENT OF INFORMATICS AND COMPUTER ENGINEERING UNM DEVELOPMENT OF A WEB-BASED NEW STUDENT ADMISSION INFORMATION SYSTEM COMMERCE INFORMATION SYSTEM: VERAL VEHICLE RENTAL WEBSITE (VEHICLE RENTAL) WITH AGILE METHOD CNC Plotter Printed Circuit Board SYSTEM DESIGN FOR CALCUALTING THE NUMBER AND DENSITY OF MOTORCYCLES IN PARKING AREA BASED ON BACKGROUND SUBTRACTION METHOD
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1