The optimal generation capacity and investment incentives of peak units

Guo-yao Liu, X. Hong, Xiao Lin, Zeng Ming
{"title":"The optimal generation capacity and investment incentives of peak units","authors":"Guo-yao Liu, X. Hong, Xiao Lin, Zeng Ming","doi":"10.1109/DRPT.2008.4523606","DOIUrl":null,"url":null,"abstract":"Taking the generator availability, operation cost and maintenance cost into consideration, a model of the optimal generation capacity for peak units is developed based on cost-benefit analysis. And the optimal capacity is calculated, from the perspective of minimal social cost and maximal investment return respectively, revealing the divergence in investment goal of society and investors. Furthermore, in reality the installed peak-load generation capacity cannot exactly meet the ideally optimal level, and the additional social cost, that is the difference of the social cost from the value at the optimal peak capacity, is asymmetric in under- and over-investment situations. Therefore over-investment, which is favored by the society because it saves much expensive lost load cost, is in contradiction to underinvestment, which is preferred by investors for lower risks. Such incompatibility in investment incentives between the society and investors is mathematically analyzed. Finally, according to the current situation of deregulation and restructuring in China's electricity sector, a proposal of raising the price cap properly to encourage generation investment is given as one of the solutions to such incompatibility. In addition, the relationship between the uplifted price cap and the stimulated generation investment is analyzed, revealing the diminishing marginal effect of price cap uplift on over-investment incentives.","PeriodicalId":240420,"journal":{"name":"2008 Third International Conference on Electric Utility Deregulation and Restructuring and Power Technologies","volume":"29 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2008-04-06","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2008 Third International Conference on Electric Utility Deregulation and Restructuring and Power Technologies","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/DRPT.2008.4523606","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

Taking the generator availability, operation cost and maintenance cost into consideration, a model of the optimal generation capacity for peak units is developed based on cost-benefit analysis. And the optimal capacity is calculated, from the perspective of minimal social cost and maximal investment return respectively, revealing the divergence in investment goal of society and investors. Furthermore, in reality the installed peak-load generation capacity cannot exactly meet the ideally optimal level, and the additional social cost, that is the difference of the social cost from the value at the optimal peak capacity, is asymmetric in under- and over-investment situations. Therefore over-investment, which is favored by the society because it saves much expensive lost load cost, is in contradiction to underinvestment, which is preferred by investors for lower risks. Such incompatibility in investment incentives between the society and investors is mathematically analyzed. Finally, according to the current situation of deregulation and restructuring in China's electricity sector, a proposal of raising the price cap properly to encourage generation investment is given as one of the solutions to such incompatibility. In addition, the relationship between the uplifted price cap and the stimulated generation investment is analyzed, revealing the diminishing marginal effect of price cap uplift on over-investment incentives.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
高峰机组最优发电容量及投资激励
考虑发电机组的可用性、运行成本和维护成本,建立了基于成本效益分析的高峰机组最优发电容量模型。并分别从社会成本最小和投资收益最大的角度计算了最优产能,揭示了社会和投资者在投资目标上的分歧。此外,在现实中,峰值发电装机容量不能完全满足理想的最优水平,并且在投资不足和过度情况下,额外的社会成本即社会成本与最优峰值容量的差额是不对称的。因此,过度投资和投资不足是矛盾的,过度投资因为可以节省大量昂贵的损失负荷成本而受到社会的青睐,而投资不足则是投资者为了降低风险而选择的。从数学上分析了社会与投资者在投资激励方面的不相容。最后,根据中国电力行业放松管制和结构调整的现状,提出了适当提高电价上限以鼓励发电投资的建议,作为解决这种不相容的方案之一。此外,本文还分析了调升电价上限与受刺激发电投资之间的关系,揭示了调升电价上限对过度投资激励的边际效应递减。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Transmission loss allocation using normalized loss weight factors Congestion management based on dynamic zoning and coordinated auctioning method Experimental study on the magnetic-controlled switcher type fault current limiter The simulating research on a improved magnetic shielding type of HTSCFCL Distribution feeder one-line diagrams automatic generation from geographic diagrams based on GIS
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1