Analysis of Peak Regulation Auxiliary Service Market Under the Deepening Stage of the Spot Market Construction

Bin Han, Zhi Cai, Zhongyang Chen, Aiqiang Pan, Jing Liu
{"title":"Analysis of Peak Regulation Auxiliary Service Market Under the Deepening Stage of the Spot Market Construction","authors":"Bin Han, Zhi Cai, Zhongyang Chen, Aiqiang Pan, Jing Liu","doi":"10.1109/ACPEE51499.2021.9437016","DOIUrl":null,"url":null,"abstract":"At present, China's peak regulation auxiliary service market has been put into operation. According to the actual situation, the peak regulation market rules formulated by various localities have improved the enthusiasm of power generation enterprises in peak regulation to a certain extent. With the development of spot market, the basis of peak regulation market has changed greatly. It is urgent to study the relationship between them. In this paper, the development of peak regulation market is deeply analyzed, and the main problems of peak load regulation are put forward. Then, the adaptability of peak regulation market and spot market is analyzed through scenario comparison, and the necessity of peak regulation market at present stage is explained. Furthermore, the paper studies and puts forward the coordination clearing mode and model between peak regulation market and spot market at the present stage, and verifies its feasibility through a practical example. Finally, some constructive suggestions are put forward for the development of peak regulation market.","PeriodicalId":127882,"journal":{"name":"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)","volume":"46 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2021-04-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"2021 6th Asia Conference on Power and Electrical Engineering (ACPEE)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.1109/ACPEE51499.2021.9437016","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

At present, China's peak regulation auxiliary service market has been put into operation. According to the actual situation, the peak regulation market rules formulated by various localities have improved the enthusiasm of power generation enterprises in peak regulation to a certain extent. With the development of spot market, the basis of peak regulation market has changed greatly. It is urgent to study the relationship between them. In this paper, the development of peak regulation market is deeply analyzed, and the main problems of peak load regulation are put forward. Then, the adaptability of peak regulation market and spot market is analyzed through scenario comparison, and the necessity of peak regulation market at present stage is explained. Furthermore, the paper studies and puts forward the coordination clearing mode and model between peak regulation market and spot market at the present stage, and verifies its feasibility through a practical example. Finally, some constructive suggestions are put forward for the development of peak regulation market.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
现货市场建设深化阶段下的调峰辅助服务市场分析
目前,中国调峰辅助服务市场已投入运行。根据实际情况,各地制定的调峰市场规则,在一定程度上提高了发电企业的调峰积极性。随着现货市场的发展,调峰市场的基础发生了很大的变化。迫切需要研究它们之间的关系。本文对调峰市场的发展进行了深入分析,提出了调峰存在的主要问题。然后,通过情景对比分析调峰市场与现货市场的适应性,说明现阶段调峰市场的必要性。在此基础上,研究提出了现阶段调峰市场与现货市场的协调清算模式和模型,并通过实例验证了其可行性。最后,对我国调峰市场的发展提出了建设性的建议。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
Transient Stability Emergency Control Based on Real-time Power Angle Trajectory Fitting Topology Identification Method for Primary Distribution Network with Limited Smart Meter Data The Steady State Limits Application of 18-pulse Rectifier in Aircraft Radar Power Supply System Yardstick motivation evaluation method for investment of distribution network A Power and Load Optimization Scheduling Model based on Flexible Thermal Load Participating in Assisted Peak Regulation
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1