{"title":"Management Optimization of Cipanunjang-Cileunca Reservoir in Bandung Regency Using Discrete Markov Methods","authors":"M. Marselina, A. Sabar, Iin Pratama Sari","doi":"10.25105/URBANENVIROTECH.V2I1.3555","DOIUrl":null,"url":null,"abstract":"This research discusses about intake Cikalong as water resource infrastructure supplying water for PDAM Bandung City and PDAM Bandung Regency that depend on the operational of Cipanunjang Dam-Cileunca Dam, Plengan Hydropower, Lamajan Hydropower, Cikalong Hydropower and water from Cisangkuy River. Nowdays, capacity of PDAM Bandung city is 1800 L/sec and capacity of PDAM Bandung Regency is 500 L/sec. However, the amount of water that could be provided by PDAM Bandung City is 1400 L/sec while PDAM Bandung Regency is 200 L/sec. Aim: Optimization on upstream infrastructure is needed to make sure the quantity of water being supplied sufficient. Methodology and Result: There are some methods that can be used to fulfill that aim, on this research use Stochastic Markov Method. The optimization of the reservoir is achieved by the condition of the guideline track and the actual trajectory approaching 1, which means the absence of wasted water through the spillway but through the reservoir utility function for turbine demand, irrigation raw water and raw drinking water in the downstream. The comparison between trajectory and actual trajectory of Cipanunjang Reservoir is 0.861 while for optimization of Cileunca Reservoir is 0.827. Conclusion, significance and impact study: The correlation between the actual (historical) discharge and the Markov estimation discharge on the Cipanunjang-Cileunca Reservoir is closed to 1, so it can be show that the discharge estimation is conceptual because it corresponds to the actual condition (actual discharge).","PeriodicalId":329428,"journal":{"name":"INDONESIAN JOURNAL OF URBAN AND ENVIRONMENTAL TECHNOLOGY","volume":"107 1","pages":"0"},"PeriodicalIF":0.0000,"publicationDate":"2018-10-30","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"2","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"INDONESIAN JOURNAL OF URBAN AND ENVIRONMENTAL TECHNOLOGY","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.25105/URBANENVIROTECH.V2I1.3555","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 2

Abstract

This research discusses about intake Cikalong as water resource infrastructure supplying water for PDAM Bandung City and PDAM Bandung Regency that depend on the operational of Cipanunjang Dam-Cileunca Dam, Plengan Hydropower, Lamajan Hydropower, Cikalong Hydropower and water from Cisangkuy River. Nowdays, capacity of PDAM Bandung city is 1800 L/sec and capacity of PDAM Bandung Regency is 500 L/sec. However, the amount of water that could be provided by PDAM Bandung City is 1400 L/sec while PDAM Bandung Regency is 200 L/sec. Aim: Optimization on upstream infrastructure is needed to make sure the quantity of water being supplied sufficient. Methodology and Result: There are some methods that can be used to fulfill that aim, on this research use Stochastic Markov Method. The optimization of the reservoir is achieved by the condition of the guideline track and the actual trajectory approaching 1, which means the absence of wasted water through the spillway but through the reservoir utility function for turbine demand, irrigation raw water and raw drinking water in the downstream. The comparison between trajectory and actual trajectory of Cipanunjang Reservoir is 0.861 while for optimization of Cileunca Reservoir is 0.827. Conclusion, significance and impact study: The correlation between the actual (historical) discharge and the Markov estimation discharge on the Cipanunjang-Cileunca Reservoir is closed to 1, so it can be show that the discharge estimation is conceptual because it corresponds to the actual condition (actual discharge).
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
基于离散马尔可夫方法的万隆县慈坪庄-慈林加水库管理优化
本研究讨论了入口慈卡龙作为水资源基础设施,为PDAM万隆市和PDAM万隆县供水,这依赖于慈朗江-慈林卡大坝、普连干水电、拉玛坚水电、慈卡龙水电和慈桑圭河水的运行。目前,万隆市PDAM容量为1800升/秒,万隆县PDAM容量为500升/秒。但是,万隆市的供水能力为1400升/秒,万隆县的供水能力为200升/秒。目的:对上游基础设施进行优化,保证供水量充足。方法和结果:有一些方法可以用来实现这一目标,在本研究中使用随机马尔可夫方法。水库的优化是在指导轨迹和实际轨迹趋近于1的条件下实现的,即溢洪道没有浪费水,而是通过水库对下游水轮机需求、灌溉原水和饮用原水的效用函数实现的。三番江水库的轨迹与实际轨迹的对比值为0.861,七番卡水库的优化轨迹值为0.827。结论、意义及影响研究:三番戎—芝伦卡水库的实际(历史)流量与马尔可夫估算流量的相关性接近于1,表明该流量估算与实际情况(实际流量)相对应,是概念上的。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
0
期刊最新文献
EFFECT OF DETENTION TIME IN REDUCING FE AND MN CONCENTRATION OF GROUNDWATER: CASE STUDY AT THE UNIVERSITAS NEGERI MALANG IMPACT OF CONSTRUCTION ACTIVITIES ON RESIDENTS OF CAPE COAST NORTH METROPOLIS, GHANA BIOPLASTIC FROM TAPIOCA STARCH WASTE AND RICE WASTE ANALYZING THE FACTORS THAT AFFECT THE AMOUNT OF PLASTIC WASTE DETERMINATION OF BATTERY WASTE MANAGEMENT STRATEGY IN THE IMPLEMENTATION OF ELECTRIC MOTORCYCLES IN DENPASAR CITY
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1