Allowance of the Emission Quota Using Life Cycle Assessment for the Creation of a National Carbon Market: Framework Developed for Hydroelectric Projects in Cameroon

Willy Noah Melingui, Ahmat Tom, Oumarou Hamandjoda
{"title":"Allowance of the Emission Quota Using Life Cycle Assessment for the Creation of a National Carbon Market: Framework Developed for Hydroelectric Projects in Cameroon","authors":"Willy Noah Melingui, Ahmat Tom, Oumarou Hamandjoda","doi":"10.4236/ajcc.2023.124023","DOIUrl":null,"url":null,"abstract":"The lack of synergy between infrastructure financing mechanisms and mechanisms for combating climate change does not favor the definition of sustainable infrastructure in Cameroon. The definition of a sustainable infrastructure could meet the requirements of these mechanisms, thanks to the control of Greenhouse Gas (GHG) emissions during its installation, in relation to a predefined value. However, the promotion of efforts to reduce emissions from new infrastructures is not subject to a local market. This situation is a limit in the implementation of the policies defined in the Nationally Determined Contribution (NDC). This article proposes a framework for promoting reduction efforts for a national carbon market, in favor of hydroelectric infrastructures. Thanks to the Life Cycle Assessment (LCA) environmental assessment tool, we are going to determine the carbon quota for a specific power. The study carried out on the hydroelectric power station of Mekin (HydroMekin) leads us to a reduction effort of 68.2% compared to the threshold defined at 14.057 gCO2eq/kWhe. The framework, developed, contributes to defining the environmental parameters in the decarbonation strategy during the implementation of new hydroelectric infrastructures and the market carbon design elements special to the construction phase of these infrastructures.","PeriodicalId":69702,"journal":{"name":"美国气候变化期刊(英文)","volume":null,"pages":null},"PeriodicalIF":0.0000,"publicationDate":"2023-01-01","publicationTypes":"Journal Article","fieldsOfStudy":null,"isOpenAccess":false,"openAccessPdf":"","citationCount":"0","resultStr":null,"platform":"Semanticscholar","paperid":null,"PeriodicalName":"美国气候变化期刊(英文)","FirstCategoryId":"1085","ListUrlMain":"https://doi.org/10.4236/ajcc.2023.124023","RegionNum":0,"RegionCategory":null,"ArticlePicture":[],"TitleCN":null,"AbstractTextCN":null,"PMCID":null,"EPubDate":"","PubModel":"","JCR":"","JCRName":"","Score":null,"Total":0}
引用次数: 0

Abstract

The lack of synergy between infrastructure financing mechanisms and mechanisms for combating climate change does not favor the definition of sustainable infrastructure in Cameroon. The definition of a sustainable infrastructure could meet the requirements of these mechanisms, thanks to the control of Greenhouse Gas (GHG) emissions during its installation, in relation to a predefined value. However, the promotion of efforts to reduce emissions from new infrastructures is not subject to a local market. This situation is a limit in the implementation of the policies defined in the Nationally Determined Contribution (NDC). This article proposes a framework for promoting reduction efforts for a national carbon market, in favor of hydroelectric infrastructures. Thanks to the Life Cycle Assessment (LCA) environmental assessment tool, we are going to determine the carbon quota for a specific power. The study carried out on the hydroelectric power station of Mekin (HydroMekin) leads us to a reduction effort of 68.2% compared to the threshold defined at 14.057 gCO2eq/kWhe. The framework, developed, contributes to defining the environmental parameters in the decarbonation strategy during the implementation of new hydroelectric infrastructures and the market carbon design elements special to the construction phase of these infrastructures.
查看原文
分享 分享
微信好友 朋友圈 QQ好友 复制链接
本刊更多论文
利用生命周期评估为建立全国碳市场提供排放配额:为喀麦隆水电项目开发的框架
基础设施融资机制和应对气候变化机制之间缺乏协同作用,这不利于喀麦隆可持续基础设施的定义。可持续基础设施的定义可以满足这些机制的要求,这要归功于在安装过程中对温室气体(GHG)排放的控制,与预定义的值有关。然而,促进减少新基础设施排放的努力不受当地市场的影响。这种情况限制了国家自主贡献(NDC)中确定的政策的实施。本文提出了一个促进全国碳市场减排的框架,有利于水电基础设施。借助生命周期评估(LCA)环境评估工具,我们将确定特定电力的碳配额。在Mekin水电站(HydroMekin)上进行的研究使我们减少了68.2%的努力,而定义的阈值为14.057 gCO2eq/ kwh。开发的框架有助于在实施新的水电基础设施期间确定脱碳战略中的环境参数,以及这些基础设施建设阶段特有的市场碳设计要素。
本文章由计算机程序翻译,如有差异,请以英文原文为准。
求助全文
约1分钟内获得全文 去求助
来源期刊
自引率
0.00%
发文量
268
期刊最新文献
Precipitation Cycles Relative to Storm Tracks, ENSO and PDO, and Drought—Continental Interior Central Western USA Are Polyploid Species Less Vulnerable to Climate Change? A Simulation Study in North American Crataegus Framework for Mainstreaming Climate Change into African Blue Economy Strategies to Enhance Adaptation, Mitigation, and Resilience in Sustainable Development Flood Forecasting and Warning System: A Survey of Models and Their Applications in West Africa Predicting Groundwater Level Using Climate Change Scenarios in the Southern Part of Mali
×
引用
GB/T 7714-2015
复制
MLA
复制
APA
复制
导出至
BibTeX EndNote RefMan NoteFirst NoteExpress
×
×
提示
您的信息不完整,为了账户安全,请先补充。
现在去补充
×
提示
您因"违规操作"
具体请查看互助需知
我知道了
×
提示
现在去查看 取消
×
提示
确定
0
微信
客服QQ
Book学术公众号 扫码关注我们
反馈
×
意见反馈
请填写您的意见或建议
请填写您的手机或邮箱
已复制链接
已复制链接
快去分享给好友吧!
我知道了
×
扫码分享
扫码分享
Book学术官方微信
Book学术文献互助
Book学术文献互助群
群 号:481959085
Book学术
文献互助 智能选刊 最新文献 互助须知 联系我们:info@booksci.cn
Book学术提供免费学术资源搜索服务,方便国内外学者检索中英文文献。致力于提供最便捷和优质的服务体验。
Copyright © 2023 Book学术 All rights reserved.
ghs 京公网安备 11010802042870号 京ICP备2023020795号-1